Sold 303± Acres

Lincoln County

Superb Cropland With Timber Situated In Central Kansas

280th Road & E Rye Dr., Lot #WP001 Barnard, KS 67423

Description

PRICE REDUCED! Offered for sale is a superb tract of cropland with great soils and outstanding recent yields. This property offers over 150 acres of pure tillable land with 75 acres currently planted to soybeans with the rest being wheat stubble. Power is already existing and a small building sits on the west side of this tract with a strip of timber making for a perfect building site. County road frontage on two sides of this tract makes for easy access at all times of the year. Being situated in Central Kansas this property usually catches ample amounts of rainfall every year and sits in a very scenic area of the state. Two other tracts of farmland are also being offered for sale next to this property, the buyer will have an opportunity to purchase three tracts of cropland for a total of approximately 303 acres. Buyer will take possession of this land upon the harvest of currently planted crops. Contact the Listing Agent today to set up a private viewing of this stunning tract of cropland before it sells!


Summary

Address

280th Road & E Rye Dr., Lot #WP001

Barnard, KS 67423

View on Google Maps

Features

Wild Game, Whitetail, Upland Game, Improvements, Investment, Minerals, Big Game, Small Game, Dove, Quail, Roads, Road Frontage, County Road, Road Access, Gravel, Tillable / Production Acres, Corn, Wheat, Milo, Soybeans, Building Improvements, Barn, Utilities, Electric, Seller's Mineral Rights Convey, Wild Game, Whitetail, Upland Game, Improvements, Investment, Minerals, Big Game, Small Game, Dove, Quail, Roads, Road Frontage, County Road, Road Access, Gravel, Tillable / Production Acres, Corn, Wheat, Milo, Soybeans, Building Improvements, Barn, Utilities, Electric, Seller's Mineral Rights Convey

Road Frontage

County Road

Road Surface

Gravel

Outbuildings

Barn

Improvements/Features

Big Game, Upland Game, Small Game, Seller's Mineral Rights Convey

Land Type

Hunting and Recreational

Land and Farm Property Types

Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • Located 40-miles from Salina and 15-miles from Lincoln. 6 miles North of HWY 18 on 280th Road
  • 150 acres of excellent cropland. Approximately 75 acres planted to soybeans and 75 acres currently wheat stubble
  • Small strip of timber exists on the west edge of this property with a small building and electrical
  • County road access on the west side and south side of the property. Maintained county roads
  • Farmland Soil Types: Geary silt loam, 3-7% slopes, 82.11 acres; Harney silt loam, 1-3% slopes, 73.42 acres; Armo-loam, 7-15% slopes, 2.07 acres; Geary-Lancaster complex, 5-10% slopes, 1.25 acres; Lancaster-Hedville complex, 3-20% slopes, 0.50 acres
  • Two other tracts adjacent are also offered for sale with this property, total of 303 acres of tillable land
  • Mineral rights will be included with this property
  • Buyer will take possession upon harvest of currently planted crops
  • Annual property taxes $2,570
  • Legal Description: N/2,SW/4 of Section 2, Township 11 South, Range 6 West in Lincoln County Kansas

Other

Coordinates

39.1219, -97.9794

Annual Taxes

$2,570

Sold Property

For more information or to see additional properties currently for sale see Mitch Keeley's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.