Alcona County
Stunning Lakefront Home On Hubbard Lake
6472 Mount Maria Rd, Lot# WP0001 Hubbard Lake, MI 49747
Description
This gorgeous custom-built lakefront home is one that you have to see to truly appreciate. With over 100' of pristine Hubbard Lake sandbar frontage on almost 2 acres, this home is the perfect spot for the family to enjoy their summers on the water. Every detail of the property was meticulously thought out, from the gated entryway, the elaborate landscaping and pavers, to the irrigation system, lighting, woodworking and marble floors, you name it. No expense was spared anywhere and it shows. Pictures and video do not do this one justice.
Some of the features of this quality custom home include:
Aluminum shingles by American Metal (lifetime warranty) on house and garage
Home built with high quality 6” structural insulated panels (SIP Construction)
8” Split cedar log siding from “Town and Country Homes”
Marine-grade OSB with taped seams wrapped in Tyvek (extremely energy-efficient home)
Powder-coated aluminum railings
All composite decking on exterior decks
Expansive custom-designed landscaping with unilock stone and pavers with accent lighting throughout
A natural boulder rock seawall
Custom aluminum automatic gated entryway
Marble and cherry wood flooring throughout
Beautiful custom woodworking and craftsmanship
Natural gas and central air conditioning
Large 30’x40’ garage with potential for future guest quarters above
2,349 square feet of living space, including 3 bedrooms, 2.5 bathrooms
Great Room with vaulted ceilings and beautiful woodwork
Full alarm system along with camera security from ADT
Hickory cabinets, granite countertops
First-floor laundry area with washer, dryer, laundry tub, expansive cabinets and folding area
Loft upstairs with panoramic views of gorgeous Hubbard Lake
For a complete list of room sizes and additional features, please reach out to the listing agent.
Hubbard Lake is one of the most beautiful inland lakes our state has to offer. Perfect for boating, jet skiing, and family fun. Hubbard Lake also offers some of the best fishing in the state as well. Also, as a bonus, for the ultimate up north getaway, a 50-acre hunt camp is available for purchase from the same owner just down the road with a beautiful cabin and detached garage for added storage. Please see Alpena 50 acres listing on our website for additional information. Contact the listing agent today for your own personal tour of either of these great properties.
Summary
Address
Features
Road Frontage
Road Surface
Land Details
Improvements/Features
Land Type
Land and Farm Property Types
Property Type
Details
- Sandbar frontage on Hubbard Lake
- Excellent fishing and recreation
- Custom built quality home, meticulously maintained
- Extravagant landscaping and lighting
- Keypad gated entry
- Large detached garage with bonus room above for potential added living space
- Full irrigation form the road to the lake on all areas of the property
Other
Housing
3BD / 3BA / 0HB
2349± sqft
Utilities
Coordinates
Annual Taxes
Sold Property
For more information or to see additional properties currently for sale see Jeff Chilman's listings.