Sold 40± Acres

Isanti County

Trophy Deer Hunting Just 30 Minutes From The Twin Cities

Highway 95, Lot#WP001 Princeton, MN 55371

Description

Here is a true trophy deer hunting parcel located about 11 miles west of Cambridge with access off of Highway 95. The current owners have harvested several bucks over 150” and they also had a big non-typical on camera last year they believe is still roaming the area. The majority of the parcel is an absolute wildlife sanctuary, with thick brushy cover along a small creek that flows through the parcel. The small creek flows down into Green Lake, which is less than a ½ from the parcels SW corner. The property is situated between two small lakes, creating the ultimate natural funnel, and bringing in cruising bucks from miles around each November. There is also plenty of nearby agricultural land that provides an excellent food source and allows the area to hold high deer numbers. There are also a few small islands of mature oaks that make for excellent stand locations and provide a secure food source for wary bucks each fall. The property also offers good hunting for bear, turkey, and upland game. If you’re looking for trophy deer hunting with just a short drive from the metro, this parcel is a must-see.


Summary

Address

Highway 95, Lot#WP001

Princeton, MN 55371

View on Google Maps

Improvements/Features

Big Game, Waterfowl, Upland Game

Features

Wild Game, Whitetail, Waterfowl, Turkey, Upland Game, Waterfront, Creek, Bear, Big Game, Pheasant, Grouse, Other Game, Duck, Roads, Road Frontage, Highway, Road Access, Pavement, Tillable / Production Acres, Pine Trees, Hardwood Trees, Area Features, Public Hunting, Public Fishing, Camping/Campground, Golf Course, Activities on Property, Hunting, ATV Riding

Road Frontage

State Highway

Road Surface

Pavement

Land Type

Hunting and Recreational, Waterfowl

Land and Farm Property Types

Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • Trophy deer hunting potential
  • Natural funnel as the parcel’s situated between two small lakes
  • Seasonal creek that flows from nearby Green Lake runs through the parcel
  • Quality hunting for bear, turkey, and upland game
  • Many quality area lakes nearby
  • About 11 miles west of Cambridge
  • Shotgun zone
  • Paved access off Highway 95
  • Just 30 minutes from the Twin Cities

Other

Coordinates

45.5867, -93.4196

Annual Taxes

$2,964

Sold Property

For more information or to see additional properties currently for sale see Eddie Odendahl's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.