Sold 60± Acres

Kanabec County

Diverse Property With Hilltop Building Sites & Pond In East Central MN

HWY 3, Lot#WP001 Brook Park, MN 55007

Description

This beautiful property has approximately ¼ mile of blacktop frontage along HWY 3 in Kanabec county. The parcel has several gorgeous hilltop building sites to put your new home or cabin. There are two approaches already in place, along with several trails that take you throughout much of the property. There is a 4 +/- acre field that runs along a mature hardwood ridgeline. The field could easily be made into an excellent food plot or fenced off to make a quality pasture for your hobby farm. A small pond lies at the bottom of the hardwood ridge and is surrounded by mature oaks. A portion of the property was select cut a few years ago leaving plenty of mature oaks scattered throughout. There is great diversity in timber with plenty of oak, maple, birch and aspen, also a few white pines. There are several quality ridge tops that could easily be cleared and made into the perfect hunting plot. The habitat is very diverse with plenty of thick cover providing bedding habitat and browse for the local wildlife. The area is known to hold high numbers of wildlife, with excellent deer, bear and turkey hunting, not to mention very good upland grouse and woodcock numbers. There are several great pinch points throughout the rolling terrain that are sure to funnel plenty of deer across the property. Bring the ATV’s as this property is close to several ATV/snowmobile trails. Location is ideal with this property sitting right between interstate 35 and HWY 65 less than 90 minutes from the cities. The possibilities are endless for this stunning and diverse property.


Summary

Address

HWY 3, Lot#WP001

Brook Park, MN 55007

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Upland Game, Waterfront, Pond (0-3 acres), Bear, Big Game, Grouse, Other Game, Roads, Road Frontage, Highway, Road Access, Pavement, Tillable / Production Acres, Hardwood Trees, Softwood Trees, Area Features, Public Hunting, Public Fishing, Camping/Campground, Golf Course, Activities on Property, Hunting, ATV Riding, Snowmobiling, Wild Game, Whitetail, Turkey, Upland Game, Waterfront, Pond (0-3 acres), Bear, Big Game, Grouse, Other Game, Roads, Road Frontage, Highway, Road Access, Pavement, Tillable / Production Acres, Hardwood Trees, Softwood Trees, Area Features, Public Hunting, Public Fishing, Camping/Campground, Golf Course, Activities on Property, Hunting, ATV Riding, Snowmobiling

Road Frontage

State Highway

Road Surface

Pavement

Land Details

Pond

Improvements/Features

Big Game, Upland Game

Land Type

Hunting and Recreational

Land and Farm Property Types

Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • Multiple hilltop building sites
  • Great hobby farm property
  • Beautiful mature hardwoods
  • Approach in place
  • Pond
  • Approximately 4 acres of field
  • Over ¼ mile blacktop frontage   
  • Excellent hunting
  • Great balance of habitat to attract wildlife
  • Approx. 90 minutes to Twin Cities
  • Approx. 5 miles off HWY 65
  • Many quality area lakes (20 +/- min to Lake Mille Lacs)

Other

Coordinates

46.0243, -93.2065

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Eddie Odendahl's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.