Sold 60± Acres

Pine County

Cabin And Metal Building With Electric, Septic, Propane, And Well

86343 Birch Creek Rd, Lot#WP001 Willow River, MN 55795

Description

Beautiful turnkey recreational property with cabin and metal building. This property is set up to be enjoyed by your family and friends, with 2 RV hookup stations. Both stations have water and electricity, and one of them also has gas and septic. The driveway winds back just into the timber for total seclusion and has a nice open yard, perfect for the volleyball court or for setting up other yard games and gives the property that park-like feel. The 12x20 cabin has an open kitchen/dining area with a bunk room just behind that. There is also a loft, and footings in place to add a bathroom off the back. The 25x47 metal building and 40’ storage container provide tons of storage space for your ATVs/snowmobiles as well as all your hunting gear. The Soo Line trail is just a ½ mile away and provides for hours of recreational enjoyment. There is a nice 16x14 picnic shelter with a gas grill hooked up to a propane line that is the perfect place to kick back and relax. Two trails take you out of basecamp and bring you to several stand locations throughout the property. The habitat is very diverse with lots of mature hardwood timber on the front 40, and a thick brushy cover including some Tamaracks in the back. The property offers quality hunting for deer, bear, turkey, and upland game. The property is only 2 hours from the Twin Cities and is an ideal setup to enjoy a summer evening over a fire, or hunting a brisk fall morning.


Summary

Address

86343 Birch Creek Rd, Lot#WP001

Willow River, MN 55795

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Upland Game, Improvements, Metal Buildings, Investment, Bear, Cabin, Big Game, Grouse, Other Game, Roads, Road Frontage, County Road, Road Access, Gravel, Tillable / Production Acres, Pine Trees, Hardwood Trees, Housing, Hunting Improvements, Tree Stands, Recreational Improvements, Trail Network, Building Improvements, Utilities, Electric, Propane, Water, Septic, Area Features, Public Hunting, Public Fishing, Camping/Campground, Golf Course, Activities on Property, Hunting, ATV Riding, Camping, Family Activities, Snowmobiling

Road Frontage

County Road

Road Surface

Gravel

Improvements/Features

Big Game, Upland Game, Tree Stands/Blinds, Trail Network

Land Type

Hunting and Recreational

Land and Farm Property Types

Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • 12x20 cabin with electric furnace
  • 25x47 metal building
  • Septic (mound)
  • Well
  • Propane tank (rented)
  • 40’ metal container with electric
  • 2 RV hookup stations with electric and water (1 also has gas and septic)
  • 16x14 picnic shelter
  • Quality hunting for all types of wildlife
  • Many quality area lakes nearby
  • Close to ATV/snowmobile trails (Soo Line Trail ½ mile away)
  • Just 2 hours from the Twin Cities

Other

Utilities

electric
Onsite
propane
Onsite
water
Onsite

Coordinates

46.3562, -92.9915

Annual Taxes

$1,494

Sold Property

For more information or to see additional properties currently for sale see Eddie Odendahl's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.