Sold 85.85± Acres

Pine County

Hunting Property With Food Plots And Metal Building

42679 Government Rd, Lot#WP001 Hinckley, MN 55037

Description

This turnkey property has a gated entry and a paved driveway leading back to an established basecamp. The driveway winds back to a nice hilltop where you’ll find the 24x45 metal building with electric and on-site well. There is a very well-maintained trail network system throughout the property, allowing you to access the box stands and food plots with little disturbance on the local deer herd. There are approximately 6 acres of food plots, with plenty of openings to expand their size. A nice 2-acre clover plot sits adjacent to basecamp and has an enclosed box stand overlooking it. The main trail going out of camp takes you to yet another hilltop with 3 acres of clover. This large plot is a magnet for the deer as it sits along a beautiful hardwood ridgeline that is loaded with a deer sign. There are multiple trails leaving this large clover plot that take you to several other box stands that are strategically placed at pinch points across the property. There is also another 1-acre oat plot tucked in near the center of the property. Another enclosed box stand overlooks this plot, and deer are often seen feeding in it late into the season. There are also 3 wildlife ponds that offer excellent duck hunting. The property has the perfect mix of habitat as it consists mostly of rolling hills of mature hardwoods, along with a few pockets of thick brushy low ground to hold high numbers of deer on the parcel. This property is a proven producer for mature bucks and has all the terrain features to continue to hold and grow quality whitetails. The property also offers excellent hunting for bears and turkeys as well as the upland game. The property is just a couple of miles off interstate 35 and within 90 minutes of the Twin Cities for quick and easy access for those weekend getaways.


Summary

Address

42679 Government Rd, Lot#WP001

Hinckley, MN 55037

View on Google Maps

Improvements/Features

Big Game, Waterfowl, Upland Game, Tree Stands/Blinds, Food Plot, Trail Network, Gated Entrance

Features

Wild Game, Whitetail, Waterfowl, Turkey, Upland Game, Waterfront, Pond (0-3 acres), Improvements, Metal Buildings, Blinds, Food Plot, Bear, Big Game, Pheasant, Grouse, Other Game, Duck, Geese, Roads, Road Frontage, County Road, Road Access, Gravel, Tillable / Production Acres, Pine Trees, Hardwood Trees, Clover, Hunting Improvements, Recreational Improvements, Trail Network, Building Improvements, Gated Entrance, Utilities, Electric, Water, Area Features, Public Hunting, Public Fishing, RV Park, Camping/Campground, Golf Course, Activities on Property, Hunting, ATV Riding, Family Activities, Snowmobiling

Road Frontage

County Road

Road Surface

Gravel

Land Details

Pond

Land Type

Hunting and Recreational, Waterfowl

Land and Farm Property Types

Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • 3 established food plots (2 in Whitetail Institute clover and 1 in oats)
  • Gated entry
  • Quality trail system
  • Paved driveway
  • 24x45 metal building with electric
  • Well
  • Additional landlocked 40 acres of state land borders the parcel
  • 5 box stands
  • 3 ponds for excellent duck hunting
  • Mature timber
  • Less than 90 minutes from the Twin Cities
  • Just a few miles off Interstate 35
  • Close to Grand Casino in Hinckley with Grand National Golf Course
  • Close to St. Croix State Park

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

46.0398, -92.8821

Annual Taxes

$1,328

Sold Property

For more information or to see additional properties currently for sale see Eddie Odendahl's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.