Sold 23.74± Acres

Winona County

Solid Timber Hunting Land Loaded With Deer Sign

Dittrich Rd., Lot#WP001 Plainview, MN 55964

Description

Don’t let the size of this parcel fool you. This parcel is all timber and has rolling terrain that makes it hunt much bigger than it is. There are several spots you can add a pond or a small food plot. The property sits at the West edge of a big draw that feeds into a huge timber tract and has a small tree line the comes from the NE that feeds into this property, creating a natural travel corridor. This property has produced well for the current owner. You can tell this is a parcel that deer come to sneak away from hunting pressure and bucks and does go to during the lockdown phase. There is a spot to park your camper if desired. Parcels of this size hardly ever come up for sale, and it is only a couple miles of 1000’s acres of Whitewater State Park. The seller requires pre-approval or proof of funds before any showings. Please respect the owner's wish for no driveby’s or driving out to the property without an approved showing. Call Bob to schedule your own private showing.


Summary

Address

Dittrich Rd., Lot#WP001

Plainview, MN 55964

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Investment, Big Game, Small Game, Other Game, Roads, Road Access, Gravel, Fence, Partial Fence, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Area Features, Public Fishing, Activities on Property, Hunting, Hiking, Camping, Family Activities

Road Surface

Gravel

Fencing

Partial

Improvements/Features

Big Game, Small Game

Land Type

Hunting and Recreational, Commercial and Development

Land and Farm Property Types

Land - Hunting, Land - Recreational, Land - Undeveloped

Property Type

Recreational Land, Undeveloped Land, Hunting Land

Details

  • All timber tract
  • Rolling terrain
  • Loaded with deer sign
  • Locations to add pond or food plots
  • Hunts much bigger than it is
  • Affordable
  • Hard to find parcel size
  • Place to park a camper if desired
  • Only minutes to 1000’s of acres of Whitewater State Park
  • Must have approved showing to be on property
  • Pre-approval or Proof of funds required for showing approval

Other

Coordinates

44.1919, -92.0733

Annual Taxes

$584

Sold Property

For more information or to see additional properties currently for sale see Bob Stalberger's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.