Sold 2.5± Acres

Lawrence County

Small Lot Good For Building Site In Southern Mississippi

Daniels Road, Lot#WP01 Oak Vale, MS 39656

Description

If you’re looking for a place to build a home or cabin this property has it all. Power and water are run into the property. It also has a power pole with two 50 amp plugins. This would be a great place to have to get away from hurricanes or you could build a camp and join one of the local hunting clubs as the hunting in this area is really good. This property is located in a really nice area which would make this a great place to retire. This is a turn-key property with all the work done. Call me for your appointment to view this awesome property.     


Summary

Address

Daniels Road, Lot#WP01

Oak Vale, MS 39656

View on Google Maps

Features

Tillable, Wild Game, Whitetail, Turkey, Improvements, Metal Buildings, Investment, Minerals, Big Game, Small Game, Other Game, Roads, Road Frontage, Highway, Road Access, Pavement, Fence, Low, Fence Material, Wire, Tillable / Production Acres, Building Improvements, Shop, Utilities, Electric, Water, Septic, Telephone, Area Features, Public Fishing, Camping/Campground, Seller's Mineral Rights Convey, Tillable, Wild Game, Whitetail, Turkey, Improvements, Metal Buildings, Investment, Minerals, Big Game, Small Game, Other Game, Roads, Road Frontage, Highway, Road Access, Pavement, Fence, Fence Material, Wire, Tillable / Production Acres, Building Improvements, Shop, Utilities, Electric, Water, Septic, Telephone, Area Features, Public Fishing, Camping/Campground, Seller's Mineral Rights Convey, Low Fence

Road Frontage

State Highway

Road Surface

Pavement

Fencing

Low Fence

Outbuildings

Shop

Land Details

Tillable

Improvements/Features

Big Game, Small Game, Seller's Mineral Rights Convey

Land Type

Hunting and Recreational, Home on Acreage, Commercial and Development

Land and Farm Property Types

Land - Commercial/Other, Land - Recreational, Land - Residential

Property Type

Recreational Land, Residential Land, Commercial Land

Details

  • 128 miles from New Orleans, LA
  • 111 miles from Mississippi Gulf Coast
  • Property is fenced for cows or horses
  • 800 ft gravel drive
  • Septic tank
  • Two 50 amp camper plugs
  • Power and water

Other

Utilities

electric
Onsite
water
Onsite
telephone
Onsite

Coordinates

31.4598, -89.9609

Annual Taxes

$54

Sold Property

For more information or to see additional properties currently for sale see Art Mott's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.