Sold 20± Acres

Washington County

Remote Beautiful Log Home On Private Gated Drive Near Richwoods

11894 St Highway A, Lot#WP001 Richwoods, MO 63071

Description

This beautiful, remote log cabin sits just 1.5 miles west of Richwoods off of Highway A. Take the scenic drive back the private gated drive across the Pinery Creek to the beautiful 4 bed, 3 bath 2500 sq’ log home. This custom-built home has some great unique character mixed with it sitting back in the countryside. The property also includes a brand new fully insulated 2400 sq’ shop with 14’ ceilings. The shop also has a fully finished bathroom and an 8” concrete floor to support any kind of construction equipment. Out the back of the home sits a beautiful in-ground pool with a concrete patio all the way around it, making a great place to relax and entertain. The property consists primarily of hardwoods with a few cedars spread throughout. The deer and turkey hunting opportunities are top-notch with all the neighboring crop ground to feed the large number of wildlife already calling this area home. If you are looking for a place to get away and relax then this is a must-see! Call today to set up your own private tour.


Summary

Address

11894 St Highway A, Lot#WP001

Richwoods, MO 63071

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Upland Game, Home, Improvements, Investment, Minerals, Big Game, Small Game, Dove, Other Game, Roads, Road Frontage, Highway, Road Access, Pavement, Housing, Recreational Improvements, Trail Network, Building Improvements, Shop, Gated Entrance, Utilities, Electric, Water, Telephone, Area Features, Public Hunting, Public Fishing, Public Access Area, RV Park, Camping/Campground, Activities on Property, Hunting, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Seller's Mineral Rights Convey

Road Frontage

State Highway

Road Surface

Pavement

Outbuildings

Shop

Improvements/Features

Big Game, Upland Game, Small Game, Trail Network, Gated Entrance, Seller's Mineral Rights Convey

Land Type

Hunting and Recreational, Home on Acreage, Timberland

Land and Farm Property Types

Land - Hunting, Land - Recreational, Land - Residential

Property Type

Recreational Land, Residential Land, Timberland

Details

  • 1.5 miles west of Richwoods, 16 miles west of Desoto, and 48 miles southwest of St Louis
  • 2500 sq’ log home
  • 2400 sq’ shop
  • In ground pool with patio
  • Borders Pinery Creek
  • Bridge across creek
  • Great deer and turkey hunting opportunities
  • Annual real estate taxes approximately $900.00

Other

Utilities

electric
Onsite
water
Onsite
telephone
Onsite

Coordinates

38.1605, -90.8503

Annual Taxes

$900

Sold Property

For more information or to see additional properties currently for sale see Jeff Heil's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.