Scioto County
Remote Hunting Outside of Lucasville, OH
0 Millers Back Run Rd, WPLot#001 Lucasville, OH 45648
Description
Price reduced! Secluded hunting property in Southeast Ohio. Located across Hockenberry Hollow, drive along the deeded access to find your property tucked away in a remote location just outside Lucasville. The acres of timber, deep draw, funnel, and water provide everything needed to create a perfect deer habitat. Culver work and drain tiles are needed at the creek crossing to create dry passage. Nice properties like this don’t last long. Call or text Brian Whitt (937)545-7764 or Cheri Poulter (937)789-5406 today to schedule your showing.
Summary
Address
Features
Road Frontage
Road Surface
Improvements/Features
Land Type
Land and Farm Property Types
Property Type
Land Details
Details
- Easy access to property via county roads
- Timber, deep draw, funnel and water to create deer habitat
- Annual taxes – $391 estimated
- CAUV credit
- Seller’s coal/oil/gas/water/timber and other mineral rights transfer
- Approximately 4 miles from the Scioto River
- Approximately 5 miles to Lucasville
- Approximately 15 miles to Portsmouth
- Use 285 Millers Back Run Rd in GPS to locate property. This address is for reference only as it is across Millers Back Run from the property for sale.