Sold 215± Acres

Major County

Waterfowl, Deer, And Turkey Combo Farm

Northsouth 268, Lot# WP001 Ames, OK 73718

Description

Western Oklahoma is known for its rolling hills, open farm ground, and big timber creek bottoms that hold big bucks, it's also arguably one of the best waterfowl flyways in the state. It's not often that you come across a property that has the topography to be a potential wetland like this one in Major County. Its flat, low-lying terrain holds water naturally through acres of grassland and timber, creating great waterfowl habitat and with a few improvements, it can be turned into a duck hunter’s paradise. The property sits less than a mile off of the Cimarron River, putting it in a prime location to attract deer traveling the river bottoms and get the attention of migrating ducks and geese. Not only are there awesome opportunities for waterfowl hunting, but the farm also holds large numbers of deer and turkeys. The waterways, cedar thickets, and large timber creek bottoms create predictable travel routes for wildlife. There are multiple large openings that will make great food plot locations and gravel oil lease roads along with other trails makes for easy travel through the property. Nice barbed wire fences give you the option to run a decent herd of cattle on the west side of the property. Paved road access on the east side along with electricity and water provides opportunities for a home or cabin location. The possibilities are endless for this Western Oklahoma farm and natural wetlands are something you don’t see every day. If you are interested or have any questions give Will Bellis a call at (918)978-9311.

Summary

Address

Northsouth 268, Lot# WP001

Ames, OK 73718

View on Google Maps

Features

Wild Game, Whitetail, Waterfowl, Turkey, Upland Game, Waterfront, Creek, Pond (0-3 acres), Improvements, Investment, Pasture, Fish, Wetlands, Hog, Big Game, Small Game, Dove, Quail, Other Game, Duck, Geese, Bass, Panfish, Roads, Road Frontage, County Road, Road Access, Pavement, Fence, Partial Fence, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Recreational Improvements, Trail Network, Utilities, Electric, Water, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, Boating, ATV Riding, Horseback Riding, Camping, Family Activities, Biking

Road Frontage

County Road

Road Surface

Pavement

Fencing

Partial

Land Details

Pond, Pasture

Improvements/Features

Big Game, Waterfowl, Upland Game, Fish, Wetlands, Small Game, Trail Network

Land Type

Hunting and Recreational, Timberland, Waterfowl

Land and Farm Property Types

Land - Hunting, Land - Recreational, Timberland - Natural

Property Type

Recreational Land, Timberland, Hunting Land

Details

  • Paved road access
  • Great whitetail habitat
  • Natural wetland
  • Turkey hunting
  • Hunting lodge or home locations
  • Electric borders property
  • Big timber creek bottom
  • Cedar thickets
  • Native grass pasture
  • Food plot locations
  • Hoyle Creek
  • Cimarron River less than a mile away
  • Gravel oil lease roads through property
  • 2 1/2 miles +\- from Ames
  • 30 minutes +\- from Enid
  • 1 1/2 hours +\- from Oklahoma City
  • 2 hours +\- from Tulsa

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

36.2174, -98.2283

Annual Taxes

N/A

Sold Property

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.