Sold 71.03± Acres

Bowie County

Turn-Key Cabin And Property In TX

7724 FM 2735,Lot#WP001 DeKalb, TX 75559

Description

PRICE REDUCED! Turnkey cabin and property! Driving off of the paved farm to Market Road you will find a privately located cabin with room for eight. The owner of the cabin took the time to add some special trim and touches throughout the cabin such as the beautiful end-cut log walls in the bedrooms. Downstairs you will find an open living and dining area, with a tiled bathroom and two bedrooms. A loft with two beds overlooks the large living area. The cabin comes complete with the couches, table, cedar beds, and new appliances. The owner is also including a Polaris Sportsman 850 camouflage ATV and an enclosed trailer. There a couple of ladder stands, feeders and a hog trap that convey with the property as well. There is an abundance of deer, hogs and turkey in this area. A nice seasonal creek runs throughout the mix of pine and hardwood timber. Much of the timber is at a stage where the new owner could do a select cutting and get an immediate return on their investment. Don’t miss out on this one if you are looking for that home away from home!

Summary

Address

7724 FM 2735,Lot#WP001

DeKalb, TX 75559

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Waterfront, Creek, Improvements, Investment, Minerals, Hog, Cabin, Big Game, Small Game, Other Game, Roads, Road Frontage, Highway, Road Access, Pavement, Tillable / Production Acres, Pine Trees, Hardwood Trees, Softwood Trees, Housing, Hunting Improvements, Feeders, Tree Stands, Recreational Improvements, Trail Network, Utilities, Electric, Water, Activities on Property, Hunting, ATV Riding, Camping, Family Activities, Seller's Mineral Rights Convey, Wild Game, Whitetail, Turkey, Waterfront, Creek, Improvements, Investment, Minerals, Hog, Cabin, Big Game, Small Game, Other Game, Roads, Road Frontage, Highway, Road Access, Pavement, Tillable / Production Acres, Pine Trees, Hardwood Trees, Softwood Trees, Housing, Hunting Improvements, Feeders, Tree Stands, Recreational Improvements, Trail Network, Utilities, Electric, Water, Activities on Property, Hunting, ATV Riding, Camping, Family Activities, Seller's Mineral Rights Convey

Road Frontage

State Highway

Road Surface

Pavement

Improvements/Features

Big Game, Small Game, Tree Stands/Blinds, Trail Network, Seller's Mineral Rights Convey

Land Type

Hunting and Recreational

Land and Farm Property Types

Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • Hunting cabin
  • Timber value
  • Deer, hog and turkey
  • Creek on property
  • FM road frontage
  • Water and electricity
  • Turnkey with trailer and ATV
  • 2 hours from Dallas

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

33.626, -94.613

Annual Taxes

$1,000
Status

Sold Property

For more information or to see additional properties currently for sale see Justin Glass's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.