Sold 6.73± Acres

Red River County

Custom Built Home On Almost Seven Acres

6123 Farm to Market Road 1701, Lot#WP001 Avery, TX 75554

Description

Located off a quiet country road you will find this stunning custom-built home. The home sits far back off of the road on the sprawling acreage. The exterior is clad with custom brick and real stained wood trim as well as a stained wooden garage door. Walking in through the front door you will find the inviting warmth of real cedar beams in the foyer and living room. The living room has a vaulted ceiling with a large gas fireplace. The kitchen is complete with a gas range, walk-in pantry, custom cabinets and a large island bar with seating for four. The master portion of the house has several custom touches like the bedroom’s brick accent wall and custom walk-in shower in the bathroom. Closets are his and hers with one being a custom concrete storm room. A mud room is conveniently located between the oversized garage and the laundry room. The kid’s bedrooms are complete with built-in desk areas, walk-in closets and a large bathroom in between. The outdoor area was designed with entreating in mind. Amenities include an outdoor TV, a brick fire pit, and a kitchen area with a sink and built-in gas grill. If you are looking for a truly custom and well thought home in the country, then this one is a must see.

Summary

Address

6123 Farm to Market Road 1701, Lot#WP001

Avery, TX 75554

View on Google Maps

Features

Home, Investment, Pasture, Roads, Road Frontage, Highway, County Road, Road Access, Pavement, Fence, Partial Fence, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Housing, Utilities, Electric, Propane, Water, Septic, Internet

Road Frontage

State Highway, County Road

Road Surface

Pavement

Fencing

Partial

Land Details

Pasture

Land Type

Ranch and Farm, Home on Acreage, Timberland

Land and Farm Property Types

Agriculture - Pasture/Ranch, Land - Residential, Timberland - Natural

Property Type

Ranches, Residential Land, Timberland

Details

  • Custom Brick and Woodwork
  • LP Tankless Water Heater
  • Gas Fireplace with Thermostat Remote
  • Storm Safe Room/Closet
  • Outdoor Kitchen with Sink and Built-in Grill
  • Outdoor TV and Fire pit
  • Oversized Garage to Fit Larger Trucks

Other

Utilities

electric
Onsite
propane
Onsite
water
Onsite
internet
Onsite

Coordinates

33.537, -94.793

Annual Taxes

$4,000
Status

Sold Property

For more information or to see additional properties currently for sale see Justin Glass's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.