Sold 409± Acres

Stonewall County

Hunting Property With Cabin In TX

Hwy 380, Lot #WP001 Aspermont, TX 79502

Description

Located just west of Aspermont is this rugged and scenic hunting property. This ranch has all you need with a cabin for the family and friends to come stay and enjoy one of the more scenic and peaceful areas of the state. Many viewpoints throughout the ranch give way to vistas of the nearby Salt Fork of the Brazos. This ranch sits on the western edge of the higher elevation of this expansive river valley. As the sun sets, it illuminates the red dirt cliffs to the east of the property and provides beautiful viewing. The landscape of the property is mostly a series of draws and hills that all fit together to provide ample hunting stand locations. The ranch is fairly well covered with mesquite and various hardwoods to hold game. The whitetail deer hunting is very good in this area and with the proximity to the river bottom, game is always sure to be near. The property also has great cover/vegetation that quail thrive in when their numbers recover. The home/cabin sits fairly tucked into a hill and provides a very nice view from the front porch. A huge bonus to the home and ranch is a very consistent and reliable water well just yards from the home. The well has a concrete water trough which could be very useful for cattle. There are approximately 67 acres of native grasses near the front of the property which would provide excellent grazing. Located just off of Hwy 380, the access to the property is as good as it gets and provides stress-free entry. This property checks all the boxes for turn-key ranches and is ready for you and yours to step in and enjoy beautiful West Texas!


Summary

Address

Hwy 380, Lot #WP001

Aspermont, TX 79502

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Upland Game, Home, Improvements, Investment, Hog, Big Game, Dove, Quail, Other Game, Fence, Low Fence, Fence Material, Wire, Livestock Facilities, Corral, Housing, Infrastructure Improvements, Wells/Pumps, Windmills, Utilities, Electric, Water, Septic, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Horseback Riding, Camping, Pasture

Fencing

Low Fence

Improvements/Features

Big Game, Upland Game, Livestock Facilities

Land Type

Ranch and Farm, Hunting and Recreational

Land and Farm Property Types

Agriculture - Farm, Agriculture - Pasture/Ranch, Land - Hunting

Property Type

Farms, Ranches, Hunting Land

Details

  • 15 Miles west of Aspermont, just off Hwy 380
  • Home/Cabin with water and electricity
  • Beautiful views and potential building sites
  • Rugged topography
  • Deer, quail, turkey and hog hunting
  • Good water well
  • Grazing area near the home for cattle
  • Neighboring pastures are thick and river bottoms

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

33.2126, -100.451

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Jackie Webb's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.