Sold 330.98± Acres

Zapata County

The Zapata 330 Ranch

FM 2687, Lot#WP001 Zapata, TX 78076

Description

PRICE REDUCED! Located approximately 14 miles east of Zapata, TX, you’ll find them easily accessible at Zapata 330 Ranch. This ranch is covered in beautiful classic south TX brush where Whitetail deer love to grow big! The ranch has city water leading to a concrete water trough and has 2 surface tanks for plentiful livestock and wildlife water supply. Electricity runs along the front road and could easily be selectively expanded onto the ranch where the new owner desires. With 3,600 feet of paved frontage along FM 2687 and ranch roads throughout the entire property, accessibility is excellent.

 


Summary

Address

FM 2687, Lot#WP001

Zapata, TX 78076

View on Google Maps

Features

Wild Game, Whitetail, Upland Game, Waterfront, Creek, Pond (0-3 acres), Investment, High Fence, Big Game, Small Game, Dove, Quail, Roads, Road Frontage, County Road, Road Access, Pavement, Fence, Low Fence, Utilities, Electric, Water, Activities on Property, Hunting, ATV Riding

Road Frontage

County Road

Road Surface

Pavement

Fencing

High Fence, Low Fence

Land Details

Pond

Improvements/Features

Big Game, Upland Game, Small Game

Land Type

Ranch and Farm, Hunting and Recreational

Land and Farm Property Types

Agriculture - Farm, Agriculture - Pasture/Ranch, Land - Hunting

Property Type

Farms, Ranches, Hunting Land

Details

  • 3600 feet of paved frontage along FM 2687
  • City water on the property for water trough supply
  • Electric available along front road
  • Fully fenced with 3 sides low fenced and 1 side high fenced
  • Good road system throughout
  • Excellent south Texas Brush perfect for Whitetail habitat

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

26.835, -99.041

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Joey Bellington's listings.

Nearby Related Properties


Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.