Sold 135± Acres

Cherokee County

Mountain Getaway Cabin And Mature Hardwood Timber Known As The Longview Property

County Road 104, Lot#WP01 Cedar Bluff, AL 35959

Description

The property is named “Longview” and the moment you crest over the ridge at the top of the driveway, you will understand the name. It has the most incredible view you can imagine, truly a premium place to build a home or mountain getaway cabin. There are numerous locations you could choose to build your dream home. Currently, there is a, well equipped, mobile home located in a perfect location to take advantage of the panoramic views. It is a 3 bedroom 2 bathroom with an open living room/kitchen area. From the porch, your gaze well cast out over Weiss Lake to the west. You will see Hog Island, Poodle Island, Round Mountain, Lookout Mountain and Weisner Mountain in the distance, along with many other landmarks. It’s a place of serenity, and peaceful natural beauty. The asphalt driveway is gated and located on a dead-end road, so there is not much traffic, very private with excellent access. The timber is primarily mature hardwoods and has not been cut in generations. There is a UTV trail on the ridgetop taking you back deeper into the tract where there are 3 wildlife food plots. It is very common to see deer, turkeys and all sorts of wildlife as you ride or walk the trails. A small pond is located down in one of the main valleys, and a mountain stream. The variety of tree and shrub species is incredible, with oaks, hickories, pines and maples in the over-story, dogwoods, native azaleas and sparkleberry in the mid-story and understory, loaded with ferns, hydrangeas and various perennials. There are migratory birds that are frequent visitors but a very cool feature of the property is an active bald eagle nest! The owners have monitored it for years and have seen several success eaglets raised over the years, and check out photos to see some excellent eagle shots. The highest point on the property has a fire pit and picnic table, where you can camp, stargaze or just relax and cook a meal over the fire with friends.  This general area of Alabama has excellent combinations of mountains and lakes and rivers and many things to do for the person that loves the outdoors. The mouth of Little River is located directly below this tract and Weiss Lake is a 35,000 plus acre public lake that has tremendous fishing and boating opportunities.  If you have closed your eyes and envisioned a place where you could have an amazing view every day when you wake up and enjoying sunsets in the evenings, over a large water view this is the one that will make it a reality. Shown by appointment only, please give me a call to set up your private showing and we will go up and see Longview.


Summary

Address

County Road 104, Lot#WP01

Cedar Bluff, AL 35959

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Waterfront, Creek, Pond (0-3 acres), Improvements, Food Plot, Investment, Cabin, Big Game, Small Game, Other Game, Roads, Road Frontage, County Road, Road Access, Pavement, Tillable / Production Acres, Hardwood Trees, Housing, Hunting Improvements, Recreational Improvements, Trail Network, Utilities, Electric, Water, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Camping/Campground, Activities on Property, Hunting, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Wild Game, Whitetail, Turkey, Waterfront, Creek, Pond (0-3 acres), Improvements, Food Plot, Investment, Cabin, Big Game, Small Game, Other Game, Roads, Road Frontage, County Road, Road Access, Pavement, Tillable / Production Acres, Hardwood Trees, Housing, Hunting Improvements, Recreational Improvements, Trail Network, Utilities, Electric, Water, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Camping/Campground, Activities on Property, Hunting, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities

Road Frontage

County Road

Road Surface

Pavement

Land Details

Pond

Improvements/Features

Big Game, Food Plot, Small Game, Trail Network

Land Type

Hunting and Recreational, Home on Acreage, Timberland

Land and Farm Property Types

Land - Hunting, Land - Recreational, Land - Residential, Timberland - Natural

Property Type

Recreational Land, Residential Land, Timberland, Hunting Land

Details

  • Premium long-range water views
  • Beautiful mature hardwood timber
  • Ridgetop cabin
  • Asphalt, gated driveway
  • UTV trail system
  • Small pond
  • Mountain stream
  • Food plots
  • Bald eagle nest
  • Loaded with deer and turkeys
  • Numerous building sites
  • Approximate driving distance minutes: 10 to Cedar Bluff; 30 to Rome, GA; 1 hour 30 minutes to North Metro Atlanta; 1 hour 15 minutes to Chattanooga; and 1 hour 30 minutes to Birmingham

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

34.248, -85.6561

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Ben Richardson's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.