Sold 216± Acres

Jackson County

Private Mountain Get-away Cabin With Outstanding Views & Mature Timber

Highway 79, Lot#WP01 Scottsboro, AL 35768

Description

Have you ever had the dream of owning a private mountain get-away cabin with outstanding views overlooking a large valley tucked back in a stand of mature hardwood timber? Has that dream also included flowing mountain streams that you can see and hear cascading off the ridge from the back deck of the cabin, and loaded with wildlife right out the back door? This property that is situated right off of Highway 79 near Skyline has all those features. There are 2 cabins at the end of a private drive, which are easily accessible by 2-wheel drive vehicle. They are both very unique, and built with the same design, 3 story structures, with a living room, kitchen and dining nook on bottom, bedroom on middle floor and space for 2 twin beds on top floor. They have power and running water, bathrooms and many modern conveniences. One of the cabins has recently been renovated, with updated interior and brand-new deck. The other cabin would need some updates. There is also a barn for storage, adjacent to the cabins. The land sets at the end of Boxes Cove which feeds up from the crop fields to the south. There are some steep areas on the tract but there are several benches and flats making good trails to access the property. Six food plots are scattered out on the west side and there are tremendous oaks all across the ridge and valley. You can drive to most of the food plots with a pickup truck and there is a good UTV trail system. Stand sites have been established for years and the owner has primarily bow hunted here for decades. Many pinch points are naturally created by the ridge and rock outcroppings. There are patches of cedar thickets that are torn up with rubs. Turkey scratching is also all throughout the timber, this area of the county is known to have very good deer and turkey populations. The main creek is a must see! Rarely have I seen such an intriguing waterway, it twists, turns and falls it’s way over the rocks and boulders as it runs more than 4500’ from north to south through the middle of the property. There are small waterfalls along the way as well as an area where over thousands of years the water has eroded into a cliff and washed out small caves into the limestone. Walking down in this valley takes you back to a time of pristine wilderness. God created a true gem the way he used the water to carve out the gorge and how he placed the trees on the edge, it takes you back decades and sure has a relaxing feel. Located just a short drive from Lake Guntersville, Huntsville and Scottsboro this tract is very convenient to many other attractions. I sure think if you are looking for a mountain get-away cabin with excellent hunting and a place for the whole family to enjoy year-round, please give this one a look and give one of us a call to setup a private showing.


Summary

Address

Highway 79, Lot#WP01

Scottsboro, AL 35768

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Waterfront, Creek, Pond (0-3 acres), Improvements, Food Plot, Investment, Spring, Cabin, Big Game, Small Game, Other Game, Roads, Road Frontage, Highway, Road Access, Pavement, Tillable / Production Acres, Hardwood Trees, Housing, Hunting Improvements, Recreational Improvements, Trail Network, Building Improvements, Barn, Utilities, Electric, Water, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Camping/Campground, Golf Course, Activities on Property, Hunting, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Wild Game, Whitetail, Turkey, Waterfront, Creek, Pond (0-3 acres), Improvements, Food Plot, Investment, Spring, Cabin, Big Game, Small Game, Other Game, Roads, Road Frontage, Highway, Road Access, Pavement, Tillable / Production Acres, Hardwood Trees, Housing, Hunting Improvements, Recreational Improvements, Trail Network, Building Improvements, Barn, Utilities, Electric, Water, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Camping/Campground, Golf Course, Activities on Property, Hunting, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities

Road Frontage

State Highway

Road Surface

Pavement

Outbuildings

Barn

Land Details

Pond

Improvements/Features

Big Game, Food Plot, Creek/Spring, Small Game, Trail Network

Land Type

Home on Acreage, Timberland, Hunting and Recreational

Land and Farm Property Types

Land - Hunting, Land - Residential, Timberland - Natural

Property Type

Residential Land, Timberland, Hunting Land

Details

  • 2 cabins
  • Outstanding mature hardwoods
  • Beautiful mountain streams
  • Food plots
  • Small pond
  • Main creek with waterfalls
  • Great deer and turkey hunting
  • Good UTV trail system
  • Awesome views
  • Drive time minutes: 30 minutes to Huntsville, 15 minutes to Scottsboro, 1 hour 15 minutes to Chattanooga, 2 hours to Nashville, 1 hour 50 minutes to Birmingham and 2 hours 20 minutes to Atlanta

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

34.765, -86.1233

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Ben Richardson's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.