Clark County
Custom Home On Hunting And Rec Land Near Westfield
1974 E. 2200th Road, Lot #WP001 Westfield, IL 62474
Description
PRICE REDUCED! Just northeast of Westfield, off of E 2200th Rd, you will find this sportsman’s paradise with endless possibilities. This property is conveniently located only 20 minutes from Charleston or Marshall, just an hour away from Champaign, or 40 minutes from Terre Haute, Indiana. Mill Creek and all that it has to offer is just minutes away. There are 36.8 acres on the east side of N 180th St, along with a home that is approximately 4160 square feet. The main level of the house has 3 bedrooms, 2 ½ bathrooms, a large 16’ x 24’ sunroom, a great room that overlooks the pond and back yard, and a spacious kitchen with an open floorplan. The kitchen also has a nice, large island which makes the perfect place for entertaining friends and family. The main level has all custom woodwork boasting hickory cabinets and doors and all tongue and groove car siding on the ceilings. The basement offers several nice storage rooms, 2 bedrooms, 1 full bathroom, a mechanical room, an indoor archery range, and features double doors that lead to the back yard. The house is connected to an outdoor whole house generator. As you make your way around the outside of the house, you will notice the nice seating area with fire pit that overlooks the pond. There is an outdoor archery range and firearm range for additional family fun. Just off the north side of the pond is a small cabin that’s all finished in hardwood trim and siding that would make a great cabin, trophy room, guest quarters, or just an additional area to entertain guests. Just behind the cabin is where the current owner has her raised garden beds and large chicken coop. There is no shortage of wildlife in and around the property that the owners enjoy seeing on a daily basis. The south half of the property is made up of thick wooded bottoms that make excellent cover for the deer and turkeys. The West Fork Creek runs east and west through the entire length of the farm and the owner has built a nice bridge so you can access both sides with ATV or tractor. There are several places for food plots around the farm and the seller is also leaving tree stands and elevated hunting towers. The remaining 6 acres is located on the west side of the road and also provides great hunting and food plot opportunities. If you have ever dreamed about living in the country and walking out your back door to hunt, fish, enjoy firearms, or just entertain friends and family you will definitely want to check out this property.
Summary
Address
Features
Road Frontage
Road Surface
Outbuildings
Land Details
Improvements/Features
Land Type
Land and Farm Property Types
Property Type
Details
- Multiple out buildings including a large 42 x 64 x 14; 27 x 42 is concrete and wood heat
- All custom woodwork on main level
- Large kitchen with open concept
- Cabin that overlooks the fully stocked pond
- 12’ x 12’ greenhouse
- Both indoor and outdoor ranges
- Whole house generator
- Nice deer and turkey population
- Reverse osmosis drinking water system, water softener and whole house humidifier
- Water proof vinyl floors, hickory cabinets and doors
- Several locations for food plots on both sides of the road
- 5 bedrooms and 3 ½ bathrooms
- 3 car attached 26’ x 40’ garage that’s heated
- A must see property with too much to offer to list everything
Other
Housing
3BD / 3BA / 0HB
4600± sqft
Utilities
Coordinates
Annual Taxes
Sold Property
For more information or to see additional properties currently for sale see Adam Crumrin's listings.