Sold 54.33± Acres

Ogle County

Beautiful Mix Of Historical Home, Timber, Creek, 4 Acres Of River Frontage.

3570 N. Il Rt. 2, Lot# WP001 Oregon, IL 61061

Description

Welcome to Bee Tree farms. This property has an amazing mix.  Starting with the house you have a historical home built in the 1930s with tons of character and charm.  Sitting back off the road this home provides tons of privacy.  Entering the home you have a beautiful staircase and open foyer.  Original wood floors escort you through the house.  Off of the entryway, you have a den with a wood fireplace, a bedroom, and a full bathroom.  As you go further into the home you have a large kitchen with tons of storage and an oversized island.  The formal dining room is off of the kitchen.  A huge family room boasts a limestone fireplace with beamed cathedral ceilings that leads out onto the screened 3 season porch. Upstairs you have 3 good-sized bedrooms.  The bathroom off of the master bedroom could be easily converted to a master suite.  The other two bedrooms share a bathroom.  The laundry is located on the main floor.  Off the main house, you have a caretaker/guest suite that has been recently remodeled.  This suite has its own kitchen, living room, and bedroom with bathroom.  3 car detached garage up by the house.  Below down by the road, you have a large outbuilding with 3 overhead doors for parking all your boats, ATV, UTVs, etc.  Off the house, you have an in-ground pool (which needs repair).  Back past the pool, you enter into the beautiful, wooded portion of the property.  This section is surrounded to the north and west by timber and ag to the south the 18 hole Silver Ridge Golf Course.  The Spring creek winds through this area of the property with trails, timber, and hills.  Perfect habitat for deer + turkey and potential hunting hot spot.  Across the road, you have 4 acres with 600 ft of Rock River frontage.  Nice sandy shore on a beautiful stretch of water that would allow for a dock. 


Summary

Address

3570 N. Il Rt. 2, Lot# WP001

Oregon, IL 61061

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Waterfront, Creek, Home, Improvements, Minerals, River, Fish, Big Game, Small Game, Other Game, Catfish, Bass, Panfish, Frontage, Roads, Road Frontage, Highway, Road Access, Pavement, Housing, Guest Quarters, Recreational Improvements, Trail Network, Boat Ramp, Utilities, Electric, Propane, Water, Septic, Internet, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, RV Park, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, Boating, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Snowmobiling, Seller's Mineral Rights Convey

Road Frontage

State Highway

Road Surface

Pavement

Improvements/Features

Big Game, Fish, Small Game, Trail Network, Seller's Mineral Rights Convey

Land Type

Hunting and Recreational, Home on Acreage

Land and Farm Property Types

Land - Hunting, Land - Recreational, Land - Residential

Property Type

Recreational Land, Residential Land, Hunting Land

Details

  • Mix of timber, creek, location, historic home
  • Historical Bee Tree Farm house
  • 2,722 Sq Ft Home with 4 Bedrooms and 3 full Bathrooms
  • Guest Quarters 1 Bed + 1 Bath + Kitchen
  • 3 Car Detached Garage
  • Oversized Outbuilding
  • 48 Acres +\- of Timber and Creek
  • 4 Acres +\- of Land Along Rock River (600 ft +\- of frontage)
  • Surrounded by timber and ag to the north and west
  • Borders 18 hole Silver Ridge Golf Course to South
  • Conveniently located 6 minutes +\- to Oregon and 9 minutes +\- to Byron
  • 30 min +\- Rockford, 1:45 +\- Chicago, 1:55 +\- Milwaukee

Other

Utilities

electric
Onsite
propane
Onsite
water
Onsite
internet
Onsite

Coordinates

42.0655, -89.3368

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Todd Henry's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.