Sold 1.73± Acres

Ogle County

Building Lot In Deer Run Estates Subdivision Near Stillman Valley

Whitetail Trail, Lot #WP001 Stillman Valley, IL 61084

Description

Building lot in the popular Deer Run Estates subdivision. This lot is ready to build with soil borings, perc test and survey already done. Close access to I-20. Located in Meridian 223 School District. Call the listing agent today to schedule a showing!


Summary

Address

Whitetail Trail, Lot #WP001

Stillman Valley, IL 61084

View on Google Maps

Features

Roads, Road Frontage, County Road, Road Access, Pavement, Utilities, Electric, Natural Gas, Water, Septic, Internet, Cable, Roads, Road Frontage, County Road, Road Access, Pavement, Utilities, Electric, Natural Gas, Water, Septic, Internet, Cable

Road Frontage

County Road

Road Surface

Pavement

Land Type

Home on Acreage

Land and Farm Property Types

Land - Residential

Property Type

Residential Land

Details

  • 10 minutes from Stillman and Byron
  • Close to I-20 and I-90
  • 20 minutes to Rockford
  • Beautiful views of the countryside

Other

Utilities

electric
Onsite
natural gas
Onsite
water
Onsite
internet
Onsite
cable
Onsite

Coordinates

42.1556, -89.2108

Annual Taxes

$1,925

Sold Property

For more information or to see additional properties currently for sale see Todd Henry's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.