Sold 15± Acres

Ogle County

Small Acreage With Unique Dome Home Near Davis Junction

8392 Kilbuck Road Davis Junction, IL 61020

Description

 

Beautiful property on small acreage with Kilbuck Creek running through where you will find a well-constructed dome house with open floor plan, GREAT natural lighting, and a floor to ceiling stone fireplace! The master bedroom is located on the main floor and includes the master bath. A second bedroom is located in the loft. Outside you have a 30 x 40 pole barn with wood burner, picnic area, and additional shed. This property provides all kinds of wildlife viewing from your porch. Deer and turkeys are known to frequent the property. Call the listing agent today to schedule a showing.

Summary

Address

8392 Kilbuck Road

Davis Junction, IL 61020

View on Google Maps

Features

Wild Game, Whitetail, Waterfowl, Turkey, Waterfront, Creek, Home, Improvements, Metal Buildings, Fish, Big Game, Small Game, Other Game, Duck, Geese, Bass, Roads, Road Frontage, County Road, Road Access, Pavement, Gravel, Housing, Building Improvements, Wild Game, Whitetail, Waterfowl, Turkey, Waterfront, Creek, Home, Improvements, Metal Buildings, Fish, Big Game, Small Game, Other Game, Duck, Geese, Bass, Roads, Road Frontage, County Road, Road Access, Pavement, Gravel, Housing, Building Improvements

Road Frontage

County Road

Road Surface

Pavement, Gravel

Improvements/Features

Big Game, Waterfowl, Fish, Small Game

Land Type

Home on Acreage, Waterfowl

Land and Farm Property Types

Land - Residential

Property Type

Residential Land

Details

  • Long private driveway
  • 30 x 40 outbuilding with concrete floor and wood stove.
  • Kilbuck Creek
  • Open floor plan
  • Granite counter tops
  • Shelter and outdoor fireplace
  • Chicken coop

Other

Coordinates

42.141, -89.0573

Annual Taxes

$3,540

Sold Property

For more information or to see additional properties currently for sale see Todd Henry's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.