Sold 36± Acres

Jackson County

Great Rec Tract With Timber Investment And Future Home Site

5000 East Block Co. Rd. 700 South Crothersville, IN 47229

Description

 Great building site as well as timber investment and recreational property. Looking for that place to build your future home but also have room to roam? This property features plenty of flat buildable acres, pasture or tillable acres, as well as timber acreage. There is plenty of blacktop road frontage, yet this property is deep enough to get off the road and make your new home more private. The flat, tillable acres would make a great place to pasture horses or start your mini farm. The timber acreage contains large pin oak, swamp white oak, and soft maple ready for harvest for a quick return on investment. The large block of hardwood timber to the east and the huge area of state-owned bottomland timber less than a mile southwest makes for a great travel corridor for monster bucks. The gentle, flat terrain makes it easy to get to your fall bow stand without breaking a sweat. The three inside corners, as well as the break line along the east side, should provide plenty of strategic bow hunting ambush sites given the recent timber harvest on the property to the east.  The gentle terrain will make riding ATV’s or UTV’s throughout the woods a breeze without worrying about muddy hillsides and rollover accidents. If you are in the market for a great recreational tract or a future home site without fighting the problems of rough terrain then call today to schedule a showing.


Summary

Address

5000 East Block Co. Rd. 700 South

Crothersville, IN 47229

View on Google Maps

Features

Tillable, Wild Game, Whitetail, Turkey, Investment, Big Game, Small Game, Other Game, Roads, Road Frontage, County Road, Road Access, Pavement, Tillable / Production Acres, Hardwood Trees, Corn, Soybeans, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Activities on Property, Hunting, Hiking, Tillable, Wild Game, Whitetail, Turkey, Investment, Big Game, Small Game, Other Game, Roads, Road Frontage, County Road, Road Access, Pavement, Tillable / Production Acres, Hardwood Trees, Corn, Soybeans, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Activities on Property, Hunting, Hiking

Road Frontage

County Road

Road Surface

Pavement

Land Details

Tillable

Improvements/Features

Big Game, Small Game

Land Type

Hunting and Recreational

Land and Farm Property Types

Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • Approx one hour north of Louisville
  • Approx 20 minutes south of Brownstown
  • Approx 15 minutes west of Crothersville
  • Approx 1/4 miles off State Road 39
  • Tillable and timber income
  • Black top road frontage
  • Good building site
  • Situated between 2 large blocks of timber surround by heavy ag production

Other

Coordinates

38.7814, -85.9343

Annual Taxes

$203

Sold Property

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.