Sold 67.7± Acres

Reno County

Recreational Property With 3 Homes Bordering The Sandhills State Park Near Hutchinson

6400 North Old K61 Highway, Lot#WP001 Hutchinson, KS 67502

Description

Located only two miles northeast of Hutchinson on Old Hwy 61, you will find one of the most unique properties to have ever hit the local market within this area. You will definitely want to read through all this property has to offer. Three homes, several ponds, shops, garages and highly sought after hunting habitat are just a few of the attributes being offered here. Situated literally next to the Sandhills State Park which is a 1,123 acre natural area that has been preserved for its sand dunes, grasslands, wetlands, and woodlands. This State Park only allows archery hunting by special permit drawing, making for low pressured wildlife and no chance of neighbors building on the adjacent 1,123 acres! Mature cottonwood trees with several scattered smaller trees and plumb thickets create ideal whitetail habitat. Open meadow areas also exist forming picture perfect food plot locations in order to put whitetails and turkeys in your lap this fall. One of the current tenants raises livestock and has equipped the property with all the facilities needed. Two of the houses are currently occupied while possession will be the date of closing. Both tenants wish to continue a lease if possible. Please call one of the listing agents for a more detailed breakdown of the property. Please note this property will be selling as is. Below is a brief breakdown of each house along with the garages and shop. 

House #1

Two story built in 1882 with a re-model performed in 1921

Square footage on the main level equals 2,140

9 total rooms, 4 bedrooms 2 bath, 1 full bath

Attached 2 car garage with shed

Separate water well and septic system

Toolshed

Enclosed porch

Concrete foundation

 

House #2

One story built in 1900 with a re-model performed in 1970

Square footage equals 1,348

6 total rooms 3 bedrooms, 1 full bath

Separate water well and septic system

Detached 3 car garage built in 1996

Wooden deck

Block foundation

 

House #3

One story built in 1982

Square footage equals 1,317

4 total rooms 2 bedrooms, 1 full bath 1 half

Nice wooden deck

Enclosed porch

One car garage

Separate water well and septic system

 

Separate Metal Building (shop)

60’ x 45’

Built in 1999

Sliding doors allow large machinery

Lean-to attached to the south end

Wood shop within the building

Office area

Bathroom/plumbing

Concrete floor


Summary

Address

6400 North Old K61 Highway, Lot#WP001

Hutchinson, KS 67502

View on Google Maps

Features

Wild Game, Whitetail, Waterfowl, Upland Game, Waterfront, Pond (0-3 acres), Home, Improvements, Metal Buildings, Blinds, Investment, Minerals, Fish, Hog, Big Game, Small Game, Dove, Quail, Other Game, Duck, Bass, Roads, Road Frontage, Highway, County Road, Road Access, Gravel, Fence, Low Fence, Cross Fence, Fence Material, Wire, Wood, Iron, Livestock Facilities, Breeding Facilities, Corral, Handling Facilities, Squeeze Chutes, Working Pens, Outdoor Arena, Tack Room, Housing, Hunting Improvements, Infrastructure Improvements, Wells/Pumps, Building Improvements, Shop, Barn, Utilities, Water, Septic, Area Features, Public Hunting, Public Fishing, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Seller's Mineral Rights Convey, Tree Stands, Recreational Improvements

Road Frontage

State Highway, County Road

Road Surface

Gravel

Fencing

Low Fence, Cross

Outbuildings

Shop, Barn

Land Details

Pond

Improvements/Features

Big Game, Waterfowl, Upland Game, Tree Stands/Blinds, Fish, Small Game, Livestock Facilities, Seller's Mineral Rights Convey

Land Type

Hunting and Recreational, Home on Acreage, Waterfowl

Land and Farm Property Types

Land - Hunting, Land - Recreational, Land - Residential

Property Type

Recreational Land, Residential Land, Hunting Land

Details

  • Located just outside of Hutchinson Kansas on Old Hwy 61
  • Borders a large contiguous acreage of land Sandhills State Park. Excellent deer and turkey opportunity
  • Three separate homes with buildings
  • Several ponds with one full of lily pads near the home area
  • Livestock facility with pasture being cross fenced
  • Beautiful timber throughout providing top notch wildlife habitat
  • Multiple out buildings and garages
  • Massive shop with office area and separate petitions
  • All houses are on separate water wells and septic systems. Separate water well is in place to fill ponds if needed
  • This property will sell as is

Other

Coordinates

38.1252, -97.8605

Annual Taxes

$6,400

Sold Property

For more information or to see additional properties currently for sale see Mitch Keeley's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.