Sold 4.84± Acres

Russell County

Beautiful Home/Hunting Lodge In North Central Kansas

19414 East Highway 18 Luray, KS 67649

Description

Situated it one of the most attractive areas in Kansas, this country home has it all. This two-story house with a basement has over 3,200 square feet and a double car garage attached. With Landscaping wrapping around the property makes it feel as if you’re at a vacation house in the country. The front deck is perfect for catching those scenic Kansas sunsets that everyone desires. The large two car garage has enough room for tools and a workbench. A mudroom is attached to the garage with entry to the house and the backyard, making it ideal for hunters after a long day in the field. The kitchen comes complete with refrigerator, stove, cabinetry, and has a great view outside the kitchen window. The living room is adjacent to the kitchen area and is accented with a balcony above the staircase that is definitely the center of attention, along with a stone fireplace that will produce heat all winter long. One bedroom and bath on the main floor along with a laundry room that is furnished with washer and dryer hookups. The upstairs has two sizeable bedrooms with attached closets and another bath. Moving downstairs, the mechanical room is equipped with a newer water heater and softening system. Central Heating and Air make this home comfortable at all times of the year. A sump pump in the basement will automatically pump any un-wanted water in the basement into the septic system. Two spacious rooms in the basement are perfect for entertaining, or additional bedrooms are an option as well. Lots of beautiful mature trees surround the property protecting it from mother nature and also adding shade for the summer months. A gravel driveway from the highway brings you right into the double car garage, keeping your vehicles clean from mud and snow. This country home is situated in a pronounced location if you’re an avid outdoorsman. The scenic Wilson Lake is only a short 18 miles from the property and Glen Elder Reservoir coming in at 48 miles. Whether it's fishing or hunting you admire, this location has both to offer. This property is set up to be a top-notch hunting lodge considering its location and expansive room. Call the listing agent today to set up a private viewing of this country home before it sells!


Summary

Address

19414 East Highway 18

Luray, KS 67649

View on Google Maps

Features

Home, Investment, Roads, Road Frontage, Highway, Road Access, Gravel, Housing, Utilities, Electric, Water, Septic, Cable, Telephone, Home, Investment, Roads, Road Frontage, Highway, Road Access, Gravel, Housing, Utilities, Electric, Water, Septic, Cable, Telephone

Road Frontage

State Highway

Road Surface

Gravel

Land Type

Hunting and Recreational, Home on Acreage

Land and Farm Property Types

Land - Hunting, Land - Recreational, Land - Residential

Property Type

Recreational Land, Residential Land, Hunting Land

Details

  • Located in the country yet only a half mile outside of Luray on east Highway 18
  • Wooden siding gives the house a very rustic appearance with several windows throughout each room with scenic views
  • Very spacious two car garage attached with electric doors. Lots of extra room for working in the garage
  • Only 18 miles from Lake Wilson and thousands of acres of public hunting. Situated in a very popular area of Kansas for incoming hunters and outdoorsman
  • Three bedrooms and two baths, central heating and air, water softening system, newer water heater
  • Lots of storage throughout the house with several closets
  • Stone fireplace and balcony in living room make the house feel very warming
  • House is mostly hidden from the highway, mature trees surround the property making it feel very protected and private
  • Basement has lots of extra room that could be converted to extra bedrooms if needed
  • House sits on nearly five acres, lots of open area to build on

Other

Housing

#1 Home
3BD / 2BA / 0HB
3271± sqft

Utilities

electric
Onsite
water
Onsite
cable
Onsite
telephone
Onsite

Coordinates

39.1174, -98.6841

Annual Taxes

$1,995

Sold Property

For more information or to see additional properties currently for sale see Mitch Keeley's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.