Sold 40± Acres

Clare County

Great Hunting Parcel And Pole Barn With Living Quarters

8595 W Lilly Lake Rd Harrison, MI 48625

Description

This property brings a lot to the table. Very good deer and turkey hunting, food plots ready to plant, a large pole barn with sleeping quarters and toy storage, and a trailer make a great deer camp. The property is divided by a creek that forms about a 7-8 acre marsh that provides great bedding and cover for the deer. The food plots are ready to plant on both sides of the creek; both have had rye recently planted but are ready to plant clover, turnips, or whatever else you might want, and there is excellent access to both sides as well. Both sides have significant timber stands as well, with lots of oaks providing acorns at a key time of year, and with the large food plots and limited other food on surrounding properties, all the deer in the area should bed and feed here on this parcel. There are several stand locations on both sides of the creek as well. The Pole building has a large separate bedroom area with a wood stove and propane heater, and in the storage area of the barn, there is a large wood burner so the entire barn can be heated easily. There are large garage doors located on both ends of the barn allowing for easy access. This building has a cement floor throughout the entire building. The trailer is older and needs some TLC but is very capable of being a nice overflow for sleeping and has a full bathroom. The owner is currently having a new well drilled to service the buildings as the old well was shallow.

These properties with pole barns that contain sleeping quarters and are heated simply do not last long.

Call me today for a private tour of this one; it is very nice.


Summary

Address

8595 W Lilly Lake Rd

Harrison, MI 48625

View on Google Maps

Land Type

Hunting and Recreational, Timberland

Property Type

Recreational Land, Timberland, Hunting Land

Land and Farm Property Types

Land - Hunting, Land - Recreational, Timberland - Natural

Road Frontage

County Road

Road Surface

Gravel

Land Details

Timber

Improvements/Features

Small Game, Big Game, Upland Game, Waterfowl, Slough, Food Plot, Trail Network, Internal Road System, Gated Entrance

Details

  • Heated pole barn with sleeping quarters
  • Very good Deer and Turkey hunting with a good population of both
  • Large food plots ready to plant in key areas
  • Great stand locations throughout the property
  • Close to Harrison MI with good access

Other

Utilities

electric
Onsite
propane
Onsite
sewer
Onsite
water
Onsite

Coordinates

44.0005, -85.0156

Annual Taxes

$1,400

Sold Property

For more information or to see additional properties currently for sale see Chuck Keefer's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.