Sold 10.01± Acres

Ogemaw County

Custom Log Home With 700' Of Rifle River Frontage

370 Rivers End, Lot# WP0001 West Branch, MI 48661

Description

!! PRICE REDUCED !! This custom-built meticulously maintained 3 bedroom/ 4 bathroom log home sits on 10 beautifully wooded acres at the end of a private road overlooking the west branch of the Rifle River. Enjoy gorgeous views from almost every room in the house. The home and matching log garage was built by a well-known quality log craftsman in northern Michigan. Every detail was thought out during the build and no expense was spared. There are over 3,000+ sq. ft. of living space with an additional 1,700+ sq. ft finished living space in the basement, including a full wet bar. The matching log garage is perfect for additional storage and complements the house perfectly. Approximately 700’ of frontage on the west branch of the Rifle River winds in front of the house with million dollar views in every direction. The west branch of the Rifle River is well known for excellent trout fishing, especially in this stretch. For the outdoorsman, the 10 acres is very secluded and you can enjoy hunting, fishing, trail riding and other outdoor activities. Call today for your very own private showing on this exceptional one-of-a-kind property. 


Summary

Address

370 Rivers End, Lot# WP0001

West Branch, MI 48661

View on Google Maps

Features

Wild Game, Whitetail, Waterfowl, Turkey, Upland Game, Waterfront, Home, Improvements, Investment, Bear, River, Fish, Big Game, Small Game, Pheasant, Dove, Quail, Grouse, Other Game, Duck, Geese, Bass, Trout, Frontage, Roads, Road Access, Gravel, Tillable / Production Acres, Pine Trees, Hardwood Trees, Softwood Trees, Housing, Recreational Improvements, Trail Network, Utilities, Electric, Generator, Propane, Water, Septic, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Snowmobiling

Road Surface

Gravel

Improvements/Features

Big Game, Waterfowl, Upland Game, Fish, Small Game, Trail Network

Land Type

Hunting and Recreational, Home on Acreage, Waterfowl

Land and Farm Property Types

Land - Hunting, Land - Recreational, Land - Residential

Property Type

Recreational Land, Residential Land, Hunting Land

Details

  • Approx 700’ of frontage on the west branch of the Rifle River
  • Meticulously maintained Custom built log home
  • Over 4,500 total sq. ft. of finished living area
  • Matching log garage for additional storage
  • Gorgeous secluded 10 acres of timber on the river
  • Fieldstone fireplace with custom insert
  • Full wet bar in basement
  • 3 bedroom/4 bathroom home

Other

Utilities

electric
Onsite
generator
Onsite
propane
Onsite
water
Onsite

Coordinates

44.249, -84.1399

Annual Taxes

$4,202

Sold Property

For more information or to see additional properties currently for sale see Jeff Chilman's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.