Sold 26± Acres

Houston County

Driftless Region Combination Hunting Farm With Home And Outbuildings

10982 Rising Sun D rive Houston, MN 55943

Description

DREAM FARM ALERT! This stunning farm is situated and the end of a 1-mile gravel road and has breathtaking views of the famed Driftless Region in all directions. The Century-old farmhouse has 3 bedrooms and 1.5 bathrooms. The bedrooms are very large in size, the septic was updated 2 years ago, there is a new steel roof on the house, a new front door, good well and more. There are many outbuildings in decent shape with one nicer 74’x36’ pole shed. There are nearly 69 acres of ridgetop tillable land. Fenced pasture is currently overgrown and provides great bedding habitat for the local deer and wildlife. The property is loaded with deer sign everywhere. There are 5 ponds on the property, south-facing slopes, top access, and rolling terrain which are just some of the best features of the property that add to the quality of this farm. The seller will leave behind a brand new Banks Stump 4 blind on 8’ steel skid system,  a brand-new Banks Stump 4 Scout and 6 new ladder stands. Food plots are planted and ready to hunt over. The rolling terrain of this property allows you to play different winds and to sneak in and out of hunting locations. The seller has the right of first refusal of the 120 acres to the west of this property and is willing to transfer this to the next owner. There is only 1 mile of county gravel road and then you are on blacktop with a quick drive to either La Crosse, WI or Winona, MN. This property is an excellent opportunity for someone looking to potentially build multiple houses or subdivide the property. With the ridgetop views and how the land lays there should be room for up to 3 more dwellings to be built on this land. Farms like this do not come along often, so give the listing agent a call to schedule your own private showing.


Summary

Address

10982 Rising Sun D rive

Houston, MN 55943

View on Google Maps

Improvements/Features

Big Game, Tree Stands/Blinds, Food Plot, Small Game, Trail Network

Features

Tillable, Wild Game, Whitetail, Turkey, Waterfront, Pond (0-3 acres), Home, Improvements, Metal Buildings, Blinds, Food Plot, Investment, Big Game, Small Game, Other Game, Roads, Road Frontage, County Road, Road Access, Gravel, Fence, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Softwood Trees, Corn, Soybeans, Housing, Hunting Improvements, Tree Stands, Recreational Improvements, Trail Network, Building Improvements, Utilities, Electric, Water, Septic, Activities on Property, Hunting, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Low Fence

Road Frontage

County Road

Road Surface

Gravel

Fencing

Low Fence

Land Details

Tillable, Pond

Land Type

Ranch and Farm, Home on Acreage, Hunting and Recreational

Land and Farm Property Types

Agriculture - Farm, Land - Hunting, Land - Residential

Property Type

Farms, Residential Land, Hunting Land

Details

  • Breathtaking views in all directions
  • Potential for up to 3 more buildable sites
  • 3 bedroom, 1.5 bath farmhouse, new septic, new roof, and 2000+sq ft
  • Located just 1 mile off of asphalt
  • Nearly 69 acres tillable
  • 2 brand new Banks Stump 4 blinds
  • 6 new ladder stands
  • Fenced pasture
  • Rolling terrain
  • South facing slopes
  • Top access
  • Loaded with deer sign
  • Well-managed deer area
  • 5 ponds
  • Food plots
  • Loaded with apple trees
  • Right of first refusal on adjoining 120 acres to the west
  • 74’x36’ pole shed
  • Barn
  • Walnut trees
  • Great option for a hobby farm
  • 15 miles to La Crosse, WI
  • 25 miles to Winona, MN

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

43.8093, -91.4763

Annual Taxes

$3,224

Sold Property

For more information or to see additional properties currently for sale see Bob Stalberger's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.