Sold 383± Acres

Jones County

Home With A Mountain Lodge Feel And Stocked Lake Near Laurel MS

155 Sharon Moss Road Laurel, MS 39443

Description

The centerpiece of this beautiful property is the rustic home positioned on one of the land’s highest vantage points.  Features like wide-plank, heart pine floors, large rustic columns and beams, and other specialty woods make this dwelling one-of-a-kind. The great room, which is open all the way up to the apex of the open gable has a spacious kitchen on the right and a wood-burning fireplace on the left, separated by a comfortable living area in the middle. Natural wood on the walls and ceiling provide a feeling of unmatched warmth and comfort. The side of the home opposite of the great room has three bedrooms and 2.5 bathrooms between two levels connected by a beautiful staircase. With the home sitting high on a hill, the view from the back porch and pool area across the entire property and beyond is nothing short of spectacular. A stocked 5 to 6-acre lake adjacent to the home provides immediate access to good fishing. A large shop on the ridge across from the home provides all the workspace and indoor storage you need. The finished living space above the shop is a bonus. Open-air equipment shed not far from the shop provides ample space for equipment storage. The land is comprised of a good mixture of woods, openings, food plots, and thick areas that is perfect for bedding and escape cover for wildlife. Tallahoma Creek forms most of the properties west boundary and provides additional diversity, beauty, and seclusion. An excellent interior road system tops off this beautiful turn-key property.  


Summary

Address

155 Sharon Moss Road

Laurel, MS 39443

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Waterfront, Creek, Lake (3+ acres), Home, Improvements, Metal Buildings, Food Plot, Investment, Fish, Big Game, Other Game, Bass, Panfish, Roads, Road Frontage, County Road, Road Access, Pavement, Tillable / Production Acres, Pine Trees, Hardwood Trees, Housing, Hunting Improvements, Infrastructure Improvements, Internal Road System, Building Improvements, Shop, Utilities, Electric, Generator, Propane, Water, Septic, Activities on Property, Hunting, Fishing

Road Frontage

County Road

Road Surface

Pavement

Outbuildings

Shop

Land Details

Lake

Improvements/Features

Big Game, Food Plot, Fish, Internal Road System

Land Type

Hunting and Recreational, Timberland

Land and Farm Property Types

Land - Hunting, Land - Recreational, Timberland - Natural

Property Type

Recreational Land, Timberland, Hunting Land

Details

  • Beautiful home with feel of a mountain lodge
  • Spectacular back porch view
  • Large shop with plenty of workspace and area for equipment storage
  • Apartment above shop
  • Open air equipment shed
  • 5-6 +/- ac stocked lake
  • Good wildlife habitat with good mixture of woods, openings and thick brush
  • Tallahoma Creek provides additional diversity and beauty, while forming most of the western boundary
  • Food plots
  • Good interior roads

Other

Utilities

electric
Onsite
generator
Onsite
propane
Onsite
water
Onsite

Coordinates

31.7991, -89.1577

Annual Taxes

$11,000

Sold Property

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.