Sold 103± Acres

Adair County

Hunting Land And Home For Sale Near Kirksville

24906 Sugar Creek School Trail Kirksville, MO 63501

Description

Conveniently located about 3 miles southwest of Kirksville lies this super nice all timber tract that not only offers great deer and turkey hunting but a small country home and a couple of older wood barns. The property is basically all timber, except for a couple of field openings that would make killer food plots! Sugar Creek flows through the farm creating a great deer travel corridor. Ridges and hollows are the makeup of the land, typical of this area. Lots of nice hardwood timber on the farm along with thick brush provides excellent bedding cover. This farm lies in a huge block of timber on neighboring tracts. On the west side on the farm sits a smaller country home with 2 bedrooms and 1 bath. The home is in need of some fix-up and is currently utilized by the sellers as their residence but would also make a great hunting camp. If you like hunting in bigger timber tracts, and like the convenience of being close to the amenities of town, this farm has it. Call listing agents for more details or to set up a showing.


Summary

Address

24906 Sugar Creek School Trail

Kirksville, MO 63501

View on Google Maps

Improvements/Features

Big Game, Small Game, Trail Network

Features

Wild Game, Whitetail, Turkey, Waterfront, Creek, Home, Improvements, Investment, Big Game, Small Game, Other Game, Roads, Road Frontage, County Road, Road Access, Gravel, Fence, Partial Fence, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Softwood Trees, Housing, Recreational Improvements, Trail Network, Building Improvements, Barn, Activities on Property, Hunting, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Low Fence

Road Frontage

County Road

Road Surface

Gravel

Fencing

Low Fence, Partial

Outbuildings

Barn

Land Type

Ranch and Farm, Timberland, Hunting and Recreational

Land and Farm Property Types

Agriculture - Farm, Land - Hunting, Timberland - Natural

Property Type

Farms, Timberland, Hunting Land

Details

  • All timber tract offering great deer and turkey hunting
  • Farm located about 3 miles southwest of Kirksville, 3.5 hours northwest of St. Louis area, 2 hours from Columbia
  • Small country home on the property with 2 bedrooms and 1 bath
  • Rural water
  • 2 wood barns on the property
  • Sugar Creek flows through the farm from north to south, good water source for wildlife, and super travel corridor
  • Couple secluded fields on the property that are perfect for killer food plots, one along creek bottom the other is in the bottom along the creek, both totally hidden locations
  • Ridges and hollows create nice terrain changes
  • Trails through the property for access (need some mowing)
  • Farm lies in nice area/neighborhood only about 1 mile off Highway 11
  • Location and convenience of being close to town but still very quiet and secluded property
  • No roads around the property other than where the house is located, secluded tract

Other

Coordinates

40.1258, -92.6271

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Jeff Propst's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.