Sold 188.56± Acres

Perry County

Food Plots, Stocked Pond, Small Cabin, Marketable Timber In Eastern Missouri

Woodridge Lane, Lot#WP001 Perryville, MO 63775

Description

This recreational timber tract is located at the end of Woodridge Lane off of Highway T about 5 miles west of Perryville. The farm is behind a locked gate in a secluded location and offers some great deer and turkey hunting opportunities very close to town. There is a great trail system throughout making it easy to access the pond and 10 m/l acres of food plots. The property has served as a topnotch hunting retreat for the same family for two generations which has lead to many successful hunts. The hardwood timber is mature and marketable as there has not been a timber harvest in over 35 years, an immediate timber harvest is available if desired. A hunting cabin sits close to the entrance and is just right for deer camp or to relax between hunts and there are 3 different storage buildings throughout the property. If you are looking for a turnkey hunting property close to town and I-55 then you should check this offering out. Call today for a private tour.


Summary

Address

Woodridge Lane, Lot#WP001

Perryville, MO 63775

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Upland Game, Waterfront, Pond (0-3 acres), Improvements, Food Plot, Investment, Minerals, Gravel/Rock/Stone, Fish, Cabin, Big Game, Small Game, Dove, Other Game, Catfish, Bass, Panfish, Roads, Road Frontage, County Road, Road Access, Gravel, Tillable / Production Acres, Hardwood Trees, Oats, Wheat, Clover, Housing, Hunting Improvements, Tree Stands, Recreational Improvements, Trail Network, Infrastructure Improvements, Internal Road System, Building Improvements, Barn, Gated Entrance, Utilities, Generator, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Seller's Mineral Rights Convey, Wild Game, Whitetail, Turkey, Upland Game, Waterfront, Pond (0-3 acres), Improvements, Food Plot, Investment, Minerals, Gravel/Rock/Stone, Fish, Cabin, Big Game, Small Game, Dove, Other Game, Catfish, Bass, Panfish, Roads, Road Frontage, County Road, Road Access, Gravel, Tillable / Production Acres, Hardwood Trees, Oats, Wheat, Clover, Housing, Hunting Improvements, Tree Stands, Recreational Improvements, Trail Network, Infrastructure Improvements, Internal Road System, Building Improvements, Barn, Gated Entrance, Utilities, Generator, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Seller's Mineral Rights Convey

Road Frontage

County Road

Road Surface

Gravel

Outbuildings

Barn

Land Details

Pond

Improvements/Features

Big Game, Upland Game, Food Plot, Fish, Small Game, Tree Stands/Blinds, Trail Network, Internal Road System, Gated Entrance, Seller's Mineral Rights Convey

Land Type

Hunting and Recreational, Timberland

Land and Farm Property Types

Land - Hunting, Land - Recreational, Timberland - Natural

Property Type

Recreational Land, Timberland, Hunting Land

Details

  • 3 miles northeast of Silver Lake, 5 miles west of Perryville, 30 minutes north of Cape Girardeau, 1.5 miles South of St Louis
  • Great deer and turkey hunting opportunities
  • Behind a locked gate at the end of Woodridge Ln, very secluded
  • Mature, marketable hardwood timber throughout, an immediate timber harvest is available
  • Small hunting cabin with generator and campground set up in a relaxing area
  • Three storage buildings
  • 1/2 acre stocked pond
  • 10 acres of food plots in place, all heavily fertilized and productive
  • Great trail system throughout
  • Real estate taxes are $150 per year

Other

Coordinates

37.7071, -89.9756

Annual Taxes

$150

Sold Property

For more information or to see additional properties currently for sale see Jeff Heil's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.