Sold 97± Acres

Warren County

Nice Cabin Overlooking Lake In The Middle Of The Woods

25999 Tower Road, Lot WP#0001 Jonesburg, MO 63351

Description

Have you ever wanted a cabin tucked way back in the woods with a nice lake to boot? Here’s your chance! This timber property is super cool and makes you feel as if you are in the middle of nowhere, even though it’s less than an hour from the STL Metro Area. The cabin features 2 guest bedrooms and a master bedroom upstairs. There is a nice bathroom on the main level and an unfinished bathroom in the master bedroom. The kitchen is super nice and has all stainless steel appliances, custom cabinetry, and granite countertops with a built-in stovetop. The living room offers great views over the lake and has a very “lodgy” feeling as you sit under the great chandelier that hangs overhead. The massive stone fireplace on the north wall makes for cozy evenings before going to bed, as well as additional seating. The wrap-around deck is perfect for spending time outside and is a great place to bbq, relax, and just enjoy the secluded setting. The basement is unfinished and is ready for the next owner to set it up the way they desire. The lake is approximately 2.5 acres and is stocked with bass, catfish, crappie, and bluegill. There is a red 30x30 metal outbuilding just up the hill from the cabin and is perfect for storing ATVs, hunting equipment, tractors, etc. The rest of the property consists of a healthy mix of big mature timber, along with some younger growth. There is also a potential food plot site on top of the ridge on the east side of the lake. This lightly hunted property has consistently produced nice bucks and big longbeards in the spring. Another bonus feature is Daniel Boone Conservation Area borders the west side of the property and adds an additional 3520 acres of hunting/recreational area so you will have plenty of room for all of your family and friends!! Too many features to list! To schedule a showing, call Aaron Bennett today!


Summary

Address

25999 Tower Road, Lot WP#0001

Jonesburg, MO 63351

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Upland Game, Waterfront, Creek, Lake (3+ acres), Improvements, Metal Buildings, Investment, Minerals, Fish, Cabin, Big Game, Small Game, Dove, Quail, Grouse, Other Game, Catfish, Bass, Panfish, Roads, Road Frontage, County Road, Road Access, Gravel, Tillable / Production Acres, Hardwood Trees, Housing, Building Improvements, Shop, Gated Entrance, Utilities, Electric, Water, Septic, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, Boating, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Snowmobiling, Seller's Mineral Rights Convey, Recreational Improvements, Lake

Road Frontage

County Road

Road Surface

Gravel

Outbuildings

Shop

Land Details

Lake

Improvements/Features

Big Game, Upland Game, Fish, Small Game, Gated Entrance, Seller's Mineral Rights Convey

Land Type

Home on Acreage, Timberland, Hunting and Recreational

Land and Farm Property Types

Land - Hunting, Land - Recreational, Timberland - Natural

Property Type

Residential Land, Timberland, Hunting Land

Details

  • Super nice 3 bedroom/2 bathroom cabin (master bedroom and bathroom are unfinished)
  • Really nice kitchen--stainless steel appliances, granite countertops
  • Wrap-around deck overlooking lake
  • Very secluded, yet convenient location—absolute peaceful setting
  • 2.5 acre stocked lake with awesome fishing
  • 30x30 machine shed for storage
  • Excellent deer and turkey hunting
  • Borders 3520 acre Daniel Boone CA for additional hunting and recreational opportunities
  • Ideal location--8 miles south of Jonesburg/Hwy 70, less than an hour from the STL Metro Area

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

38.7891, -91.3678

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Aaron Bennett's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.