Sold 757± Acres

Wright County

Affordable Rolling Pasture Land For Sale In Southwest MO

Panther Hollow Road, Lot #WP001 Mansfield, MO 65704

Description

Limitless possibilities on a large tract in a great location. These rolling hills and hollers are genuinely loaded with wildlife and all the habitat for them to thrive. The diverse stand of mature hardwoods and areas of thick cover provide year-round food and shelter. Hundreds of walnut trees add value now and in the future. Live water in Bryant Creek winds over 4500 feet through the property while several ponds and springs add valuable water sources for all the critters. Over a dozen open fields dot the landscape with a mix of cool and warm-season grasses currently keeping 30+ head of cattle fat and slick. Diverse terrain throughout the property with access made easy by roads and trails in every direction. Electric and a well are on the property at the old homestead. Two solid barns stand in good shape, one of which would convert nicely into a hunting camp. As an investment, this property is priced to sell and will garner equity quickly with a little TLC and time. Call today to schedule your tour.


Summary

Address

Panther Hollow Road, Lot #WP001

Mansfield, MO 65704

View on Google Maps

Improvements/Features

Big Game, Upland Game, Creek/Spring, Fish, Small Game, Livestock Facilities, Trail Network, Internal Road System, Seller's Mineral Rights Convey

Features

Wild Game, Whitetail, Turkey, Upland Game, Waterfront, Creek, Pond (0-3 acres), Improvements, Metal Buildings, Investment, Spring, Pasture, Bear, Minerals, Fish, Cabin, Big Game, Small Game, Dove, Quail, Other Game, Catfish, Bass, Panfish, Roads, Road Frontage, County Road, Road Access, Gravel, Fence, Partial Fence, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Softwood Trees, Livestock Facilities, Loafing Sheds, Housing, Recreational Improvements, Trail Network, Infrastructure Improvements, Internal Road System, Wells/Pumps, Building Improvements, Shop, Barn, Utilities, Electric, Propane, Water, Septic, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Seller's Mineral Rights Convey, Low Fence

Road Frontage

County Road

Road Surface

Gravel

Fencing

Low Fence, Partial

Outbuildings

Shop, Barn

Land Details

Pond, Pasture

Land Type

Ranch and Farm, Timberland, Hunting and Recreational

Land and Farm Property Types

Agriculture - Pasture/Ranch, Land - Hunting, Timberland - Natural

Property Type

Ranches, Timberland, Hunting Land

Details

  • Located only 40 miles to Springfield
  • County road frontage only minutes off Highway 60
  • Beautiful building spots tucked back in secluded spots
  • Very scenic and live Bryant Creek flows through the valley for approximately 9/10 of a mile
  • Large stand of hardwoods and harvest ready cedars
  • Excellent hunting for whitetail deer, turkey and small game
  • Maximum seclusion and privacy
  • 9 miles to Mansfield
  • 12 miles to Ava

Other

Utilities

electric
Onsite
propane
Onsite
water
Onsite

Coordinates

37.0712, -92.6659

Annual Taxes

$474

Sold Property

For more information or to see additional properties currently for sale see Brian W. Utecht's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.