Sold 62± Acres

Warren County

Timber Investment With Renovated Farmhouse For Sale In Northwest PA

5326 Jackson Run Road, Lot#WP001 Warren, PA 16365

Description

Rare acreage and fully renovated farmhouse on Jackson Run Road do not hit the market often. This is a beautiful farm setting with all the features wanted on a hobby farm and family setting. The farmhouse sets overlooking the Jackson Run valley with great landscaping surrounding it. The blacktop driveway allows for a circle drive around the house to the garage and back to Jackson Run Road. The garage has a one-car ability on one side and a workshop with heating ability on the other. The tillable fields lead back to the spruce and pine tree plantation on one side and an orchard and secluded potential food plot on the other. The woods lead to Muddy run and up over the hillside, providing hardwood saw timber for a potential investment. Call today to set up a showing on this truly investment opportunity.


Summary

Address

5326 Jackson Run Road, Lot#WP001

Warren, PA 16365

View on Google Maps

Features

Tillable, Wild Game, Whitetail, Waterfowl, Turkey, Upland Game, Waterfront, Creek, Home, Improvements, Food Plot, Investment, Spring, Bear, Minerals, Natural Gas, Oil, Big Game, Small Game, Dove, Grouse, Other Game, Duck, Roads, Road Frontage, County Road, Road Access, Pavement, Tillable / Production Acres, Pine Trees, Hardwood Trees, Softwood Trees, Orchard, Hay, Housing, Hunting Improvements, Recreational Improvements, Trail Network, Building Improvements, Shop, Barn, Utilities, Electric, Natural Gas, Water, Septic, Area Features, Public Hunting, Public Fishing, Public Access Area, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, Boating, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Snowmobiling, Seller's Mineral Rights Convey, Tillable, Wild Game, Whitetail, Waterfowl, Turkey, Upland Game, Waterfront, Creek, Home, Improvements, Food Plot, Investment, Spring, Bear, Minerals, Natural Gas, Oil, Big Game, Small Game, Dove, Grouse, Other Game, Duck, Roads, Road Frontage, County Road, Road Access, Pavement, Tillable / Production Acres, Pine Trees, Hardwood Trees, Softwood Trees, Orchard, Hay, Housing, Hunting Improvements, Recreational Improvements, Trail Network, Building Improvements, Shop, Barn, Utilities, Electric, Natural Gas, Water, Septic, Area Features, Public Hunting, Public Fishing, Public Access Area, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, Boating, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Snowmobiling, Seller's Mineral Rights Convey

Road Frontage

County Road

Road Surface

Pavement

Outbuildings

Shop, Barn

Land Details

Tillable, Hay

Improvements/Features

Big Game, Waterfowl, Upland Game, Food Plot, Creek/Spring, Small Game, Trail Network, Seller's Mineral Rights Convey

Land Type

Hunting and Recreational, Home on Acreage, Waterfowl

Land and Farm Property Types

Land - Hunting, Land - Recreational, Land - Residential

Property Type

Recreational Land, Residential Land, Hunting Land

Details

  • Beautiful fully renovated/restored home
  • Hardwood interior and new Hickory Kitchen
  • Garage, one car and wood shop with above storage
  • Barn/storage above
  • Timber investment
  • Secluded food plot location beside Muddy Run
  • Great wildlife populations including: Deer, Grouse, Bear, Turkey
  • Great bedding in pine and spruce forest for winter cover
  • Thick bedding regrowth areas
  • Muddy run through the middle
  • Oil and gas rights transfer

Other

Utilities

electric
Onsite
natural gas
Onsite
water
Onsite

Coordinates

41.9049, -79.2374

Annual Taxes

N/A

Sold Property

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.