Sold 203.79± Acres

Ashland County

Northern Wisconsin Hunting Land With Building Locations

T 41 N R 1 W Section 8 Butternut, WI 54514

Description

A great piece of property with a deeded entrance access from the highway that brings you into the property's trail system. A great area for whitetail, black bear, ruffed grouse, snowshoe hare, and turkey. A mixture of hardwood timber surrounded by heavy cover with regenerating tamarack and black spruce. The property also borders the south edge of farmland and is utilized as a bedding area for whitetail. Established small hay fields exist in the property that could be used as food plot locations and/or building locations. A spring-fed pond in the southeast 40 is the headwaters of Spiller Creek which eventually feeds Butternut Lake and is a well-known fishing lake nearby the property. All in all the property is a great find with diverse habitat, a lot of wildlife, and very affordable.


Summary

Address

T 41 N R 1 W Section 8

Butternut, WI 54514

View on Google Maps

Features

Wild Game, Whitetail, Waterfowl, Turkey, Upland Game, Waterfront, Creek, Pond (0-3 acres), Improvements, Blinds, Food Plot, Investment, Spring, Bear, Wetlands, Big Game, Small Game, Grouse, Other Game, Duck, Roads, Road Frontage, Highway, Road Access, Dirt, Tillable / Production Acres, Pine Trees, Hardwood Trees, Softwood Trees, Hunting Improvements, Recreational Improvements, Trail Network, Government Programs, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Snowmobiling, Managed Forest Land (MFL)

Road Frontage

State Highway

Road Surface

Dirt

Land Details

Pond, Enrolled in Government Program

Improvements/Features

Big Game, Waterfowl, Upland Game, Tree Stands/Blinds, Food Plot, Creek/Spring, Wetlands, Small Game, Trail Network

Land Type

Hunting and Recreational, Waterfowl

Land and Farm Property Types

Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • About 4 hours north of Madison
  • About 3 hours northeast of the Twin Cities
  • About 5 1/2 hours north of Milwaukee
  • Hiking, hunting, cross country ski
  • Whitetail, bear, grouse, snowshoe, turkey
  • Nearby Turtle Flambeau Flowage
  • Nearby Chequamegon Bay
  • Building and food plot locations
  • Spring pond and headwater of Spiller Creek
  • Trail system

Other

Coordinates

46.0475, -90.5201

Annual Taxes

$1,665

Sold Property

For more information or to see additional properties currently for sale see Mike Noskoviak's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.