Sold 67± Acres

Bayfield County

Private Lake In Northern Wisconsin’s Bayfield County

Phantom Lake Road, Lot #WP001 Iron River, WI 54856

Description

An amazing property connected with two private lakes, Phantom Lake and Little Phantom Lake or also known as Mud Flat Lake. Both lakes contain Walleye, Crappie, Bluegill, Perch, Northern Pike, and both Largemouth and Smallmouth Bass. Surrounded by mature Oak, Aspen, Maple, and Birch, the Fall colors are absolutely incredible. The property also features shoreline frontage on Big Phantom and views of both lakes are available in between the lakes. Already existing is a cleared area perfect for building with underground power coming in and a well. At one time this property was utilized as a campground by the former owners and several concrete pads have been installed for RV use. The property is located in a very private setting with close access to County Highway H in Delta Wisconsin. 


Summary

Address

Phantom Lake Road, Lot #WP001

Iron River, WI 54856

View on Google Maps

Features

Wild Game, Whitetail, Waterfowl, Turkey, Upland Game, Waterfront, Lake (3+ acres), Improvements, Investment, Bear, Fish, Big Game, Small Game, Grouse, Other Game, Duck, Geese, Pike, Walleye, Bass, Panfish, Frontage, Lake, Roads, Road Frontage, Highway, County Road, Road Access, Gravel, Tillable / Production Acres, Hardwood Trees, Recreational Improvements, Trail Network, Boat Ramp, Infrastructure Improvements, Internal Road System, Wells/Pumps, Building Improvements, Gated Entrance, Utilities, Electric, Water, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, Boating, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Snowmobiling, Wild Game, Whitetail, Waterfowl, Turkey, Upland Game, Waterfront, Lake (3+ acres), Improvements, Investment, Bear, Fish, Big Game, Small Game, Grouse, Other Game, Duck, Geese, Pike, Walleye, Bass, Panfish, Frontage, Lake, Roads, Road Frontage, Highway, County Road, Road Access, Gravel, Tillable / Production Acres, Hardwood Trees, Recreational Improvements, Trail Network, Boat Ramp, Infrastructure Improvements, Internal Road System, Wells/Pumps, Building Improvements, Gated Entrance, Utilities, Electric, Water, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, Boating, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Snowmobiling

Road Frontage

State Highway, County Road

Road Surface

Gravel

Land Details

Lake

Improvements/Features

Big Game, Waterfowl, Upland Game, Fish, Small Game, Trail Network, Internal Road System, Gated Entrance

Land Type

Hunting and Recreational, Timberland, Waterfowl

Land and Farm Property Types

Land - Hunting, Land - Recreational, Timberland - Natural

Property Type

Recreational Land, Timberland, Hunting Land

Details

  • Land and access to two private lakes
  • Great fishing for walleye, crappie, northern pike, bass
  • Great deer hunting locations on the property
  • Your own private lake with excellent building locations
  • Power and water already on the property and ready to use
  • 3 ½ hours north of Minneapolis-St. Paul
  • 5 ½ hours north of Madison
  • 1 hour east of Duluth, MN
  • Ruffed grouse and turkeys
  • Located within the Chequamegon National Forest
  • About 3 hours north of the Twin Cities
  • About 5 hours north of Madison
  • About 6 hours north of Milwaukee
  • Hardwood timber and lake views
  • Excellent gated entrance road
  • Great fishing lakes
  • Deer hunting locations
  • Peaceful, private, and beautiful
  • Located within the boundaries of Chequamegon National Forest
  • Nearby Pike Chain of lakes
  • Nearby Chequamegon Bay of Lake Superior

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

46.49, -91.2896

Annual Taxes

$2,919

Sold Property

For more information or to see additional properties currently for sale see Mike Noskoviak's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.