Crawford County
Small Acreage With Home, Outbuilding And Numerous Amenities
19875 N. 200th Street Oblong, IL 62449
Description
It is not every day that a property like this is put on the market. This is a must-see listing that checks almost every box on many people’s list of priorities. The first thing you will notice when you pull up to the property is the gated entrance and driveway alarm. As you make your way up the driveway, you are instantly drawn to the beautiful pond behind the house. The pond is roughly 1¼ acres and is stocked with fish. It also has power ran to it for the aerators and even a fountain if the new owner would like to add one. Just north and west of the pond you will find a little over 4 acres that would be the perfect location to add food plots for deer, turkeys, or even doves and quail. Just south of the house is a 48x64 all-steel building with concrete floors and two large overhead doors on both ends.
Upon entering the house, you will find a large, open living room with a stone fireplace and a stunning view of the pond. The living room and dining area are perfect for entertaining. Just off the living and dining areas, you will enter the kitchen, which boasts granite countertops, cherry cabinets, and stainless appliances. The living room, dining area and kitchen all have cherry hardwood floors. Just off the kitchen is the laundry room and breezeway which leads to the back porch and attached three-car garage. The main level also has two spacious bedrooms and one full bathroom with a jetted tub. The master bedroom and bathroom are located upstairs. The master bedroom is 14x20 and also has an amazing view of the pond. The large master bathroom has tile floors, vanity, and a large walk-in shower. Just outside the bathroom is a spacious walk-in closet with built-in racks and shelves. In addition to the master bed and bath, there are two additional bedrooms upstairs. One of the bedrooms has an 8x10 balcony overlooking the beautiful back yard. As you make your way to the basement, you will first notice the access to the back patio. Once downstairs you will find the game room with a large projector and screen, a wet bar area, and a full bathroom.
The back yard is your own oasis featuring the 40 x 20 sport pool with auto cover. The pool area is the perfect spot to entertain with multiple seating areas. The pool house kitchen has granite countertops, grill with rotisserie, warming drawer, ice machine, two burners, stainless sink, sound system, and roll up steel doors on three sides. A stone fireplace with a built-in pizza oven is located just off the pool house. This is truly a one-of-a-kind, must-see property. There is the possibility of adding additional land to the east if someone is looking for a little more space. Call the listing agents today to set up your private showing of this outstanding offering.
Summary
Address
Improvements/Features
Features
Road Frontage
Road Surface
Land Details
Land Type
Land and Farm Property Types
Property Type
Details
- 48’ x 64’ all steel building and concrete floor
- 3-car attached garage
- Nice 1-acre pond stocked with fish
- Inground pool with pool house, fireplace, and pizza oven
- Gated drive for privacy
- Open area for food plots, garden, or whatever the owner desires
- Game room located in basement with walk-out basement
- Additional acres are available
Other
Housing
5BD / 3BA / 0HB
4000± sqft
Utilities
Coordinates
Annual Taxes
Sold Property
For more information or to see additional properties currently for sale see Adam Crumrin's listings.