Sold 175± Acres

Lee County

Hunting Land For Sale With Cabin And Income Near Amboy

Morgan Road, Lot #WP001 Amboy, IL 61310

Description

If you’re a hunter this is the property for you. This property has excellent road access with two different gated entrances on the north and south end of the parcel. To the north, you have a long private road that leads you back to the one bedroom, one bathroom cabin. The cabin has electric and propane heater. The cabin could use some updates as it has not been used in a few years. There is also a 28 x 56 post frame building. The building is has a concrete floor with drain, water, electric, insulated with liner on the inside. Established trails weave through the property. 103 acres are currently enrolled into CRP program until 2022 with a total annual income of $14,622. Estimated  65 (+/-) acres are currently in CRP but could be converted back into tillable acres after expiration of CRP contract. Low grounds on the north stay a little wetter in the early months but dry out as the year goes by. Excellent deer and turkey hunting as well as good fishing. This property has a ton of potential to turn into a hunter's paradise. Close to the Greene River and surrounded by other good habitat and timber tracts. Call the listing agent today to set up your private showing of this income-producing hunting and rec tract.


Summary

Address

Morgan Road, Lot #WP001

Amboy, IL 61310

View on Google Maps

Improvements/Features

Big Game, Fish, Small Game, Tree Stands/Blinds, Trail Network, Gated Entrance

Features

Wild Game, Whitetail, Turkey, Waterfront, Pond (0-3 acres), Improvements, Metal Buildings, Investment, Conservation Reserve Program (CRP), Fish, Cabin, Big Game, Small Game, Other Game, Catfish, Bass, Roads, Road Frontage, County Road, Road Access, Pavement, Fence, Partial Fence, Fence Material, Wire, Tillable / Production Acres, Pine Trees, Hardwood Trees, Softwood Trees, Corn, Soybeans, Clover, Hay, Housing, Hunting Improvements, Tree Stands, Recreational Improvements, Trail Network, Building Improvements, Gated Entrance, Government Programs, Utilities, Electric, Propane, Water, Septic, Area Features, Public Hunting, Boat Ramp, Public Fishing, RV Park, Camping/Campground, Golf Course, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Snowmobiling

Road Frontage

County Road

Road Surface

Pavement

Fencing

Partial

Land Details

Pond, Enrolled in Government Program, Hay

Land Type

Ranch and Farm, Timberland, Hunting and Recreational

Land and Farm Property Types

Agriculture - Farm, Land - Hunting, Timberland - Natural

Property Type

Farms, Timberland, Hunting Land

Details

  • Easy hard surface road access
  • 2 gated entrances
  • Cabin with electric, water, propane fireplace
  • 28x56 outbuilding with water, drain, electric, insulated
  • 103 acres in CRP with an annual income $14,622
  • Excellent deer and turkey hunting with good water sources on the property and close by
  • Shallow pond with good fishing
  • Established trail system
  • 2 hours from Chicago, 1 hour from Rockford

Other

Utilities

electric
Onsite
propane
Onsite
water
Onsite

Coordinates

41.6876, -89.382

Annual Taxes

$1,966

Sold Property

For more information or to see additional properties currently for sale see Todd Henry's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.