Sold 8.76± Acres

Howard County

Great Building Site With Pond In MO

State Highway A, Lot #WP001 Clark, MO 65243

Description

 Looking for a great building site? This tract has blacktop road access with water and electric on site, Pond and Hardwood ridges and over and acre of open ground.  Great little hunting tract.


Summary

Address

State Highway A, Lot #WP001

Clark, MO 65243

View on Google Maps

Improvements/Features

Big Game, Small Game

Features

Wild Game, Whitetail, Turkey, Waterfront, Pond (0-3 acres), Investment, Big Game, Small Game, Other Game, Roads, Road Frontage, Highway, County Road, Road Access, Pavement, Gravel, Fence, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Hay, Utilities, Electric, Water, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Camping/Campground, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Camping, Family Activities, Low Fence

Road Frontage

State Highway, County Road

Road Surface

Pavement, Gravel

Fencing

Low Fence

Land Details

Pond, Hay

Land Type

Hunting and Recreational

Land and Farm Property Types

Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • Blacktop road frontage
  • Water and electric on site
  • Multiple building sites
  • Pond
  • Hardwood ridges
  • Cedar thickets
  • 35 minutes from Columbia, 2 ½ hours from Greater St. Louis area

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

39.235, -92.4982

Annual Taxes

$350

Sold Property

For more information or to see additional properties currently for sale see Clay Lockard's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.