Sold 16.7± Acres

Pike County

Small Acreage Building Site Near Eolia

Pike Road 225 Eolia, MO 63344

Description

This property would make a great building site. Located at the end of a blacktop road, ½ mile from the Eolia city limits. The property consists of rolling green pastures and panoramic views. There are multiple building sites with great road access and plenty of room for livestock. Give me a call to schedule your private tour.


Summary

Address

Pike Road 225

Eolia, MO 63344

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Upland Game, Improvements, Blinds, Investment, Pasture, Big Game, Small Game, Dove, Other Game, Roads, Road Frontage, County Road, Road Access, Pavement, Gravel, Fence, Low, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Softwood Trees, Soybeans, Clover, Hay, Hunting Improvements, Utilities, Electric, Telephone, Activities on Property, Hunting, ATV Riding, Horseback Riding, Wild Game, Whitetail, Turkey, Upland Game, Improvements, Blinds, Investment, Pasture, Big Game, Small Game, Dove, Other Game, Roads, Road Frontage, County Road, Road Access, Pavement, Gravel, Fence, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Softwood Trees, Soybeans, Clover, Hay, Hunting Improvements, Utilities, Electric, Telephone, Activities on Property, Hunting, ATV Riding, Horseback Riding, Low Fence

Road Frontage

County Road

Road Surface

Pavement, Gravel

Fencing

Low Fence

Land Details

Pasture, Hay

Improvements/Features

Big Game, Upland Game, Tree Stands/Blinds, Small Game

Land Type

Ranch and Farm

Land and Farm Property Types

Agriculture - Pasture/Ranch

Property Type

Farms, Ranches

Details

  • Multiple home sites
  • Rolling pasture ground
  • Great road access
  • Electric power and county water available along road frontage
  • Panoramic views
  • Perimeter fencing
  • 1/2 mile from Eolia
  • 45 minutes from the Great St. Louis area

Other

Utilities

electric
Onsite
telephone
Onsite

Coordinates

39.2425, -90.995

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Clay Lockard's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.