Sold 76± Acres

Putnam County

Hunting And Rec Land With Small Country Home In Northeast MO

Raspberry Trail Unionville, MO 63565

Description

If you are looking for a great deer and turkey hunting tract with a nice little house to stay in, or perhaps live in the country and run a few cattle or horses you need to take a look at this property. This farm is a super nice tract with a great blend of timber, brush, hay and pasture ground and has some super nice secluded locations to plant food plots. A good road system is in place for access around the farm that leads to a couple permanent deer stands that are located in proven spots. Setting on the southwest corner of the farm is a nice little country house that features 2 bedrooms, 1 bath and a kitchen and living area, the kitchen and bathroom have new flooring in it and nice cabinets, the only thing the house needs is some floor coverings in the bedrooms and living area, this a is nice little house, and could be used as a residence or a great hunting camp. Call listing agent for more information or to set up a showing, these smaller high-quality tracts are hard to find!


Summary

Address

Raspberry Trail

Unionville, MO 63565

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Upland Game, Waterfront, Pond (0-3 acres), Home, Improvements, Blinds, Investment, Big Game, Small Game, Dove, Quail, Other Game, Roads, Road Frontage, County Road, Road Access, Gravel, Fence, Low, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Softwood Trees, Clover, Hay, Housing, Hunting Improvements, Recreational Improvements, Trail Network, Infrastructure Improvements, Internal Road System, Building Improvements, Gated Entrance, Utilities, Electric, Water, Internet, Telephone, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Wild Game, Whitetail, Turkey, Upland Game, Waterfront, Pond (0-3 acres), Home, Improvements, Blinds, Investment, Big Game, Small Game, Dove, Quail, Other Game, Roads, Road Frontage, County Road, Road Access, Gravel, Fence, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Softwood Trees, Clover, Hay, Housing, Hunting Improvements, Recreational Improvements, Trail Network, Infrastructure Improvements, Internal Road System, Building Improvements, Gated Entrance, Utilities, Electric, Water, Internet, Telephone, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Low Fence

Road Frontage

County Road

Road Surface

Gravel

Fencing

Low Fence

Land Details

Pond, Hay

Improvements/Features

Big Game, Upland Game, Tree Stands/Blinds, Small Game, Trail Network, Internal Road System, Gated Entrance

Land Type

Ranch and Farm, Timberland, Hunting and Recreational

Land and Farm Property Types

Agriculture - Farm, Land - Hunting, Timberland - Natural

Property Type

Farms, Timberland, Hunting Land

Details

  • Super nice hunting and recreational tract with nice small country house
  • Property located off of Raspberry Trail
  • Farm makeup includes approximately 19 acres of hay/pasture with the balance in timber
  • Good access from well-maintained county road
  • Great hunting layout on this property, good thick brush and timber, there are several awesome spots to put food plots that are super secluded
  • Farm will provide great deer and turkey hunting, habitat is great
  • Nice trail system for access around the farm
  • Farm not only makes a great hunting tract but well suited for running some cattle or horses, property is perimeter fenced
  • Couple ponds provide good water for wildlife and or cattle and horses; one of the ponds was stocked with catfish
  • 900 sq. ft. country home sets on the southwest corner of the farm. 2 bedrooms and 1 bath, would make a super nice hunting camp or residence
  • Rural water, electric all in place, internet is available also
  • Nice quiet location

Other

Utilities

electric
Onsite
water
Onsite
internet
Onsite
telephone
Onsite

Coordinates

40.4346, -92.716

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Jeff Propst's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.