Sold 193± Acres

Sullivan County

Deer And Turkey Hunting Farm With Income In North Central MO

Key Road Green City, MO 63545

Description

Here is a nice income-producing and hunting farm that is located in the central part of the county, near Pennville. This farm has great deer habitat and 80 acres M/L of nice laying tillable land that is open for the 2020 crop season. Nice big block of hardwood timber to the south, brushy creek bottom, thickets all provide good habitat for deer and turkeys, the crop fields were not farmed in 2019 and have a beautiful stand of native grasses at time of listing. On the north end of the farm sets an older 2 bedroom 1 bath ranch style house that needs some work, but makes an ideal hunting camp, or could be remodeled into a residence. Call for more information!


Summary

Address

Key Road

Green City, MO 63545

View on Google Maps

Features

Tillable, Wild Game, Whitetail, Turkey, Upland Game, Waterfront, Creek, Home, Improvements, Investment, Big Game, Small Game, Dove, Quail, Other Game, Roads, Road Frontage, County Road, Road Access, Gravel, Fence, Low, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Softwood Trees, Housing, Recreational Improvements, Trail Network, Infrastructure Improvements, Internal Road System, Utilities, Electric, Water, Activities on Property, Hunting, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Tillable, Wild Game, Whitetail, Turkey, Upland Game, Waterfront, Creek, Home, Improvements, Investment, Big Game, Small Game, Dove, Quail, Other Game, Roads, Road Frontage, County Road, Road Access, Gravel, Fence, Fence Material, Wire, Tillable / Production Acres, Hardwood Trees, Softwood Trees, Housing, Recreational Improvements, Trail Network, Infrastructure Improvements, Internal Road System, Utilities, Electric, Water, Activities on Property, Hunting, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Low Fence

Road Frontage

County Road

Road Surface

Gravel

Fencing

Low Fence

Land Details

Tillable

Improvements/Features

Big Game, Upland Game, Small Game, Trail Network, Internal Road System

Land Type

Hunting and Recreational

Land and Farm Property Types

Agriculture - Farm, Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • Nice deer and turkey hunting and income producing tract located approx 5 miles north of Green City
  • Farm makeup consists of approx 80 acres tillable, balance in timber, brush, creek bottom and home site with older farm house on the north end of the property
  • Tillable land is open from leases for 2020 crop season
  • This is a nice combination farm that will provide good deer and turkey hunting, and income
  • Older 2 bedroom, 1 bath farm house on the property needs some work but will make a great hunting camp house, or could be fixed up into a residence
  • Farm is accessed from the north off of Key Road, about a mile and a half off of Highway 129
  • There is an easement into the south end of the property for farm machinery into the crop fields that lie south of Spring Creek
  • Pretty stand of oak and hickory timber on the south end of the property
  • Spring Creek flows through the farm, super deer corridor

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

40.3334, -92.9329

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Jeff Propst's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.