Sold 24.42± Acres

Mercer County

Frontage On The Little Shenango River In PA

Pearson road, Lot #WP001 Hadley, PA 16130

Description

Often times properties have either exceptional hunting or fishing, this is the rare property that offers both!  This parcel has private access to unlimited fishing on the Little Shenango River which is a stocked trout stream.  The woods are loaded with buck sign and bordered with neighboring crop fields which create the perfect staging area.  On an aerial map, this little gem is the perfect natural funnel for game.  The rolling mature hardwood stand provides timber value and mast crop for the wildlife.  The property is accessed by a nice drive that leads to the majority of this secluded parcel.  If you desire to build or camp on the property there are potential locations for that as well.    The seller’s oil, gas & mineral rights transfer.  Please contact the listing agent for your private tour!


Summary

Address

Pearson road, Lot #WP001

Hadley, PA 16130

View on Google Maps

Improvements/Features

Big Game, Waterfowl, Upland Game, Fish, Small Game, Seller's Mineral Rights Convey

Features

Wild Game, Whitetail, Waterfowl, Turkey, Upland Game, Waterfront, Investment, Bear, Minerals, River, Fish, Big Game, Small Game, Pheasant, Dove, Quail, Grouse, Other Game, Duck, Geese, Bass, Panfish, Trout, Frontage, Tillable / Production Acres, Pine Trees, Hardwood Trees, Softwood Trees, Area Features, Public Hunting, Public Fishing, Public Access Area, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Snowmobiling, Seller's Mineral Rights Convey

Land Type

Hunting and Recreational, Waterfowl

Land and Farm Property Types

Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • Great wildlife populations
  • Frontage on the Little Shenango River which offers exceptional trout fishing
  • Mature hardwood timber
  • Gently rolling terrain
  • Loaded with buck sign
  • Neighboring crop fields
  • Natural funnels and pinch point
  • Great staging area
  • Seller’s oil, gas & mineral rights transfer
  • Short distance to State Game Land 270
  • Short distance to the Shenango River Lake
  • 20 minutes to Mercer
  • 1 hour 15 minutes to Pittsburgh
  • 1 hour 45 minutes to Cleveland, OH

Other

Coordinates

41.4165, -80.2509

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Josh Ongley's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.