Sold 218.88± Acres

Henderson County

Recreation And Timber Tract In Northeast TX

CR 4835, Lot# WP001 Larue, TX 75770

Description

PRICE REDUCED! Recreation and Timber Tract with Great Hunting! This property is in a great location, is covered in wildlife, and will provide timber income for upcoming years. There is also a water well on the property that provides water to a former vineyard and nearby metal building with kitchen sink and restroom. The potential to thin some timber, select clear a few areas, and add to or new improvements would make this place a show property, a dream hunting property, or both! Call today to set up your own private showing!


Summary

Address

CR 4835, Lot# WP001

Larue, TX 75770

View on Google Maps

Features

Wild Game, Whitetail, Improvements, Metal Buildings, Investment, High Fence, Minerals, Hog, Big Game, Small Game, Other Game, Roads, Road Frontage, County Road, Road Access, Dirt, Fence, Low, Fence Material, Wire, Tillable / Production Acres, Pine Trees, Vineyard, Recreational Improvements, Trail Network, Farming Improvements, Irrigation systems, Infrastructure Improvements, Wells/Pumps, Building Improvements, Gated Entrance, Utilities, Electric, Water, Septic, Area Features, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Golf Course, Airport, Activities on Property, Hunting, ATV Riding, Horseback Riding, Camping, Family Activities, Seller's Mineral Rights Convey, Wild Game, Whitetail, Improvements, Metal Buildings, Investment, Minerals, Hog, Big Game, Small Game, Other Game, Roads, Road Frontage, County Road, Road Access, Dirt, Fence, Fence Material, Wire, Tillable / Production Acres, Pine Trees, Vineyard, Recreational Improvements, Trail Network, Farming Improvements, Irrigation systems, Infrastructure Improvements, Wells/Pumps, Building Improvements, Gated Entrance, Utilities, Electric, Water, Septic, Area Features, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Golf Course, Airport, Activities on Property, Hunting, ATV Riding, Horseback Riding, Camping, Family Activities, Seller's Mineral Rights Convey, High Fence, Low Fence

Road Frontage

County Road

Road Surface

Dirt

Fencing

High Fence, Low Fence

Improvements/Features

Big Game, Small Game, Trail Network, Irrigation System, Gated Entrance, Seller's Mineral Rights Convey

Land Type

Hunting and Recreational

Land and Farm Property Types

Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • Road access to the property off of CR 4835
  • Great habitat and full of wildlife including whitetail deer, wild hogs, coyotes, bobcats, and more
  • Good water well provides water up to 20 gpm to metal building and irrigated vineyard
  • Farm equipment included: 33 hp New Holland tractor, 60” Bush Hog mower, 1994 4wd Ford F-150, 20’ tandem trailer, Yamaha ATV, plus assorted farm implements
  • Just over 15 minutes from Athens, Under 45 minutes from Tyler, and under an hour and a half from Downtown Dallas
  • Boundaries as outlined in yellow on aerials are approximate and to be verified by survey

Other

Utilities

electric
Onsite
water
Onsite

Coordinates

32.1829, -95.7073

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Aaron Ablondi's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.