Sold 125± Acres

Henderson County

Twin Oaks Ranch And Training Facility In Northeast TX

SH 31 E, Lot #WP001 Murchison, TX 75778

Description

Twin Oaks Ranch and Training Facility: This property would make a great ranch and recreation property for someone looking for beautiful pastures, some timber, and ranch improvements. The property is gently rolling terrain. The entrance to this property is off of State Highway 31 and leads up to 3 steel building barns. The property is currently utilized as a thoroughbred horse training facility and includes 71 horse stalls, fly spray system, large covered round pen with an electric walker, vent fans, 10x20 office with small efficiency apartment, 6 Furlong Track, and a couple of spring-fed ponds one time stocked for fishing. There are plenty of whitetail deer and other East Texas critters on the property if you like hunting or watching wildlife! Call today to set up your own private showing!


Summary

Address

SH 31 E, Lot #WP001

Murchison, TX 75778

View on Google Maps

Features

Wild Game, Whitetail, Upland Game, Waterfront, Creek, Pond (0-3 acres), Improvements, Metal Buildings, Investment, Pasture, Minerals, Fish, Hog, Big Game, Small Game, Dove, Other Game, Bass, Panfish, Roads, Road Frontage, Highway, Road Access, Pavement, Gravel, Fence, Low, Cross Fence, Partial Fence, Fence Material, Wire, Iron, Tillable / Production Acres, Hay, Livestock Facilities, Corral, Handling Facilities, Loading Chutes, Stables, Tack Room, Housing, Outbuilding w/Living Quarters, Infrastructure Improvements, Wells/Pumps, Building Improvements, Barn, Utilities, Electric, Water, Septic, Internet, Cable, Telephone, Area Features, Boat Ramp, Public Fishing, Marina, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, ATV Riding, Horseback Riding, Camping, Family Activities, Surface Only, Wild Game, Whitetail, Upland Game, Waterfront, Creek, Pond (0-3 acres), Improvements, Metal Buildings, Investment, Pasture, Minerals, Fish, Hog, Big Game, Small Game, Dove, Other Game, Bass, Panfish, Roads, Road Frontage, Highway, Road Access, Pavement, Gravel, Fence, Cross Fence, Partial Fence, Fence Material, Wire, Iron, Tillable / Production Acres, Hay, Livestock Facilities, Corral, Handling Facilities, Loading Chutes, Stables, Tack Room, Housing, Outbuilding w/Living Quarters, Infrastructure Improvements, Wells/Pumps, Building Improvements, Barn, Utilities, Electric, Water, Septic, Internet, Cable, Telephone, Area Features, Boat Ramp, Public Fishing, Marina, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, ATV Riding, Horseback Riding, Camping, Family Activities, Surface Only, Low Fence

Road Frontage

State Highway

Road Surface

Pavement, Gravel

Fencing

Low Fence, Cross, Partial

Outbuildings

Barn

Land Details

Pond, Pasture, Hay

Improvements/Features

Big Game, Upland Game, Fish, Small Game, Livestock Facilities, Surface Only

Land Type

Hunting and Recreational

Land and Farm Property Types

Land - Hunting, Land - Recreational

Property Type

Recreational Land, Hunting Land

Details

  • Road access to the property off of State Highway 31 between Athens and Murchison
  • Great habitat and full of wildlife including whitetail deer, wild hogs, coyotes, bobcats, and more
  • Hay fields provide on average approximately 350 round bales of grass
  • Just under 10 minutes from Athens, Under 40 minutes from Tyler, and approx.. one hour and fifteen minutes from Downtown Dallas

Other

Utilities

electric
Onsite
water
Onsite
internet
Onsite
cable
Onsite
telephone
Onsite

Coordinates

32.265, -95.7666

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Aaron Ablondi's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.