Sold 453± Acres

Van Buren County

Signature Lakosky Offering - Premier Hunting Farm In Managed Neighborhood

TBD 175th Street Keosauqua, IA 52565

Description

Much of our country’s best real estate is spoken for, tucked away and held long-term by those who understand its value. But every once in a while, opportunity knocks, and a door opens to begin writing your own chapter on a farm that others only dream of calling their own.

This 453-acre property represents one of the most complete hunting and income-producing farms we’ve brought to market. To take it further, it’s been managed by the nation’s most recognizable whitetail couple—Lee and Tiffany Lakosky.

It’s located in a tightly held neighborhood between Pittsburg and Douds in central Van Buren County, where landowners are known for letting deer reach full maturity.

The layout is clean and efficient, stretching one mile wide by one mile tall. You couldn’t ask for a better mix of habitat: hardwood timber, thick brush, rolling pasture, oak plantings, and productive ag fields. Everything ties together, and the entire property feels whole. With expansive cover and abundant food, this is the type of farm where deer can grow up and express their full potential.

A Lakosky fundamental, food plots play a major role in this setup, and they’ve been taken to a high level. Nearly 40 acres are planted in corn, soybeans, legumes, brassicas, and cereal grain blends. Soil amendments and thoughtful rotation have been used to build long-term attraction and herd health. These aren’t just fields to hunt over—they’re part of a year-round nutritional program.

Seven access points allow for low-impact entry and exit regardless of wind direction. There’s a full mile of road frontage on the north, with additional access from the west and south. A mowed trail system connects the interior, making it easy to reach every plot, stand, and camera site without disturbance.

170 acres are rented for row crop, alfalfa, and light pasture. The same local farmer has worked the land for years, known for being reliable and taking great care of the ground. At $160 per acre, the income is steady and dependable.

The hunting history of this farm is understated but significant. While the Lakoskys have documented recent years well, the previous owner was quiet but consistently successful. The current layout builds on that legacy with a design that supports age structure and buck retention. The size and cover keep deer home, while surrounding landowners contribute to the neighborhood’s high standard of management.

Opportunities like this are rare. To own a farm of this scale and quality, personally developed by one of the most respected names in the hunting world, is a serious chance to continue a legacy of whitetail stewardship at the highest level. Contact Ben Harshyne with the Southeast Iowa Land Team for more information.

This is one of three farms that we’re offering for sale within a 5-mile drive of each other: a 208 with a cabin, a 133, and this 453. All together these make a turnkey offering of signature hunting farms that are managed by the Lakoskys, right here in the heart of Van Buren County.


Summary

Address

TBD 175th Street

Keosauqua, IA 52565

View on Google Maps

Land Type

Hunting and Recreational, Ranch and Farm, Timberland

Property Type

Farms, Ranches, Recreational Land, Timberland, Hunting Land

Land and Farm Property Types

Agriculture - Farm, Land - Hunting, Land - Recreational

Road Frontage

County Road

Road Surface

Gravel

Fencing

Partial, Low

Land Details

Pasture, Timber, Tillable, Hay, Open, Pond

Improvements/Features

Small Game, Big Game, Upland Game, Predators, Creek/Spring, Livestock Facilities, Food Plot, Tree Stands/Blinds, Trail Network, Internal Road System, Gated Entrance

Activities on Property

Hunting, Hiking, ATV Riding, Camping, Biking, Fishing, Horseback Riding, Family Activities

Roads

Road Frontage, Road Access

Nearby Features

Public Fishing, Camping/Campground, Golf Course

Livestock Facilities

Equine

Tillable/Production Areas

Tillable, Alfalfa, Hardwood Trees, Corn, Soybeans

Waterfront

Pond (0-3 acres)

Wild Game

Upland Game, Small Game, Big Game

Recent Property Improvements

Food plot, Trail network, Tree stand/Blinds, Internal Road Network, Gated entrance

Details

  • Top-shelf hunting farm in a great big buck area
  • Owned and managed by Lee Lakosky
  • Documented big buck history
  • 170 acres being cash rented to a local farmer, producing $27,200 annually
  • 7 different access points from the north, west, east, and south
  • 9 food plots already planted in corn, soybeans, and clover
  • Great pinch points and small plots for bowhunting
  • Large destination plots for late season hunting
  • In a neighborhood with like-minded whitetail managers
  • Thick bedding cover throughout
  • Tall hardwood trees, ridges, fencerows, and thick timber
  • Multiple drainages and 5 ponds for water sources
  • Lots of hunting options for different wind directions
  • Multiple great building sites overlooking the farm
  • One of 3 farms offered for sale within 5 miles of each other

Other

Coordinates

40.785163, -92.050875

Annual Taxes

N/A

Sold Property

For more information or to see additional properties currently for sale see Ben Harshyne's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.