Sold 58± Acres

McDonald County

Turn Key Cattle And Horse Farm Nestled In The Heart Of The Ozarks

1333 Scotch Hollow Rd, LOT#WP001 Noel, MO 64854

Description

You're home! Welcome to one of the most exceptional cattle and horse farms that you will find on the market today. This spectacular turnkey farm is truly a must-see. Nestled in the heart of the Ozarks, you will be captivated by the breathtaking, panoramic views along with all the features this property has to offer. With a gated entrance as well as a long private drive, this property offers privacy and seclusion with only being a short drive into town. The spacious but cozy home has been remodeled and offers numerous upgrades. The woodwork and custom walnut cabinets give you that warm feeling of being home on the farm. With two bedrooms and one and one-half baths along with a large living room and open kitchen, you will have plenty of room to entertain family and friends. There is also an oversized shop area that has it’s own half bath as well as an enclosed area that is great for entertaining or could be used as an additional shop and storage space. The farm offers a great combination of open pasture and hardwood timber with a wonderful trail system to access any point on the property. It’s also fenced and crossed fenced with multiple frost-free faucets throughout. With a working corral and head chute along with the multiple storage/hay barns, all the place needs is some livestock and you. For the wildlife enthusiasts out there, you will love all the deer and turkey that call the area home. With large mature timber and multiple natural funnels and pinch points, you will have plenty of places to hang your stand this hunting season. Water will not be in short supply with two ponds and a live spring. Don’t miss out on this amazing opportunity to own the “Original American Dream”.  Please call today to schedule your private tour or for driving directions


Summary

Address

1333 Scotch Hollow Rd, LOT#WP001

Noel, MO 64854

View on Google Maps

Features

Wild Game, Whitetail, Turkey, Waterfront, Pond (0-3 acres), Home, Improvements, Metal Buildings, Investment, Spring, Pasture, Minerals, Big Game, Small Game, Other Game, Roads, Road Frontage, County Road, Road Access, Gravel, Fence, Low, Cross Fence, Fence Material, Wire, Tillable / Production Acres, Pine Trees, Hardwood Trees, Livestock Facilities, Cattle Guards, Corral, Handling Facilities, Head Gates, Squeeze Chutes, Stock Tanks, Working Pens, Loafing Sheds, Tack Room, Housing, Recreational Improvements, Trail Network, Infrastructure Improvements, Wells/Pumps, Building Improvements, Shop, Barn, Gated Entrance, Utilities, Electric, Propane, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Seller's Mineral Rights Convey, Wild Game, Whitetail, Turkey, Waterfront, Pond (0-3 acres), Home, Improvements, Metal Buildings, Investment, Spring, Pasture, Minerals, Big Game, Small Game, Other Game, Roads, Road Frontage, County Road, Road Access, Gravel, Fence, Cross Fence, Fence Material, Wire, Tillable / Production Acres, Pine Trees, Hardwood Trees, Livestock Facilities, Cattle Guards, Corral, Handling Facilities, Head Gates, Squeeze Chutes, Stock Tanks, Working Pens, Loafing Sheds, Tack Room, Housing, Recreational Improvements, Trail Network, Infrastructure Improvements, Wells/Pumps, Building Improvements, Shop, Barn, Gated Entrance, Utilities, Electric, Propane, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Marina, RV Park, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Fishing, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Seller's Mineral Rights Convey, Low Fence

Road Frontage

County Road

Road Surface

Gravel

Fencing

Low Fence, Cross

Outbuildings

Shop, Barn

Land Details

Pond, Pasture

Improvements/Features

Big Game, Creek/Spring, Small Game, Livestock Facilities, Trail Network, Gated Entrance, Seller's Mineral Rights Convey

Land Type

Hunting and Recreational, Home on Acreage

Land and Farm Property Types

Land - Hunting, Land - Recreational, Land - Residential

Property Type

Recreational Land, Residential Land, Hunting Land

Details

  • Spectacular turnkey cattle and horse farm in the heart of the Ozarks
  • Conveniently located within a short 45 minute drive to the heart of Northwest Arkansas
  • 45 minutes to Neosho and only 15 minutes from Noel
  • Cozy remodeled home with breathtaking views
  • Two bedrooms with one and one half bath
  • Custom woodwork and cabinets throughout
  • Large attached shop with concrete floor and half bath
  • Tornado shelter
  • Multiple outbuildings and storage space
  • Farm is fenced and crossed fenced
  • Multiple frost-free faucets for all of your watering needs
  • Cattle coral with working chute
  • Ponds as well as a live spring
  • Plenty of wildlife that includes deer and turkey
  • Great trail system and mature timber throughout

Other

Utilities

electric
Onsite
propane
Onsite

Coordinates

36.5819, -94.4796

Annual Taxes

$500

Sold Property

For more information or to see additional properties currently for sale see Tony Chrisco's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.