Sold 84.25± Acres

Crawford County

Diverse Recreational Property Bordering PA State Game Lands 101

N. Beaver Road, Lot #WP001 Springboro, PA 16435

Description

PRICE REDUCED! This is a unique recreational property that offers woods, open areas, a large beaver pond and borders PA State Game Lands 101. Near the front of the property, you will encounter the East Branch of Conneaut Creek which is a nice small stream. There is an approximate 12-acre hidden field that would make an excellent place to have a secluded food plot or two. The field has not been farmed in a few years and is currently brush which could provide nice small game habitat. The scattered hardwoods in the center of the property provide great cover for the wildlife. There is also the presence of oak trees that provide mast crop for the wildlife. This wooded area coupled with the edge of the beaver pond could make an ideal natural funnel for the deer. This was quite obvious by the abundance of tracks during my initial inspection! The middle section of the property consists of a large 20 +/- acre beaver pond. The pond would make a great place to fish, trap or hunt waterfowl. The pond is large enough to enjoy canoeing or kayaking as well. The rear wooded acreage is difficult to access but is doable using the neighboring game lands which share portions of three common boundaries. PA State Game Land 101 in total is 5050 acres. If this sounds like a property you may be interested in please reach out to the listing agent for your personal tour!


Summary

Address

N. Beaver Road, Lot #WP001

Springboro, PA 16435

View on Google Maps

Improvements/Features

Big Game, Waterfowl, Upland Game, Fish, Wetlands, Small Game, Trail Network, Surface Only

Features

Tillable, Wild Game, Whitetail, Waterfowl, Turkey, Upland Game, Waterfront, Lake (3+ acres), Improvements, Investment, Bear, Minerals, Fish, Wetlands, Big Game, Small Game, Pheasant, Dove, Quail, Grouse, Other Game, Duck, Geese, Bass, Panfish, Roads, Road Frontage, County Road, Tillable / Production Acres, Pine Trees, Hardwood Trees, Softwood Trees, Recreational Improvements, Trail Network, Area Features, Public Hunting, Public Fishing, Public Access Area, Activities on Property, Hunting, Fishing, Hiking, Boating, ATV Riding, Horseback Riding, Camping, Family Activities, Biking, Snowmobiling, Surface Only, Lake

Road Frontage

County Road

Land Details

Tillable, Lake

Land Type

Hunting and Recreational, Timberland, Waterfowl

Land and Farm Property Types

Land - Hunting, Land - Recreational, Timberland - Natural

Property Type

Recreational Land, Timberland, Hunting Land

Details

  • Great wildlife populations including deer, bears and turkeys
  • Nice stream near the entrance of the property
  • Trail system
  • 20+/- acre beaver pond for fishing, boating and waterfowl hunting
  • Secluded field providing food plot locations and small game hunting
  • Natural funnels and pinch points
  • Scattered oak trees for mast production
  • Seller to retain all oil, gas and mineral rights
  • Property is included in an “Agricultural Security Area”
  • Building may be difficult without constructing a road and bridge (well and septic are buyers responsibility)
  • 15 minutes to Albion
  • 30 minutes to Meadville
  • 50 minutes to Erie
  • 1 hour 45 minutes to Cleveland, OH
  • 2 hours to Pittsburgh

Other

Coordinates

41.8381, -80.4669

Annual Taxes

$390

Sold Property

For more information or to see additional properties currently for sale see Josh Ongley's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.