Sold 45.39± Acres

Erie County

Big Woods, Tillable Fields And Great Wildlife Populations

6322 Route 6N, Lot#WP001 Edinboro, PA 16412

Description

This great property offers the perfect mix of timber, tillable and brush.  This property is the perfect transition from the big woods to the north to all the tillable fields surrounding this property.  The highly productive tillable acreage provides not only an income but a huge draw for the wildlife.  The timber portions of the property have been highly managed with a perfect blend of income and wildlife habitat in mind.  There is a small stream that crosses the property along the brushy draws that provides water for the wildlife.  This transition area has several apple and mast producing oak trees.  There are also perfect locations for secluded food plots.  Access from two roads is another benefit, you have options depending on wind direction.  This property truly has everything a big buck could need! There is also a small 1 bed 1 bath dwelling on the property that would make the perfect camp or starter home.  The cabin features a new water well, enclosed porch, full basement and a brand-new furnace.  With a small amount of TLC this could be the perfect basecamp.  In addition, the property is only ½ mile from I-79 so if you are commuting from Erie or Pittsburgh this could be the perfect location.  This property has a rich history of successful turkey hunts as well.  This location provides a quick trip to great fishing including Lake Erie, Edinboro Lake and Pymatuning!  Call the listing agent today for your private showing of this great property!  


Summary

Address

6322 Route 6N, Lot#WP001

Edinboro, PA 16412

View on Google Maps

Improvements/Features

Big Game, Upland Game, Food Plot, Creek/Spring, Small Game, Tree Stands/Blinds

Features

Wild Game, Whitetail, Turkey, Upland Game, Waterfront, Improvements, Food Plot, Spring, Bear, Cabin, Big Game, Small Game, Pheasant, Dove, Quail, Grouse, Other Game, Roads, Road Frontage, Highway, Tillable / Production Acres, Pine Trees, Hardwood Trees, Softwood Trees, Corn, Soybeans, Housing, Hunting Improvements, Tree Stands, Utilities, Electric, Propane, Natural Gas, Water, Septic, Internet, Telephone, Area Features, Public Hunting, Boat Ramp, Public Fishing, Public Access Area, Camping/Campground, Golf Course, Airport, Activities on Property, Hunting, Hiking, ATV Riding, Horseback Riding, Camping, Family Activities

Road Frontage

State Highway

Land Type

Hunting and Recreational, Home on Acreage

Land and Farm Property Types

Land - Hunting, Land - Recreational, Land - Residential

Property Type

Recreational Land, Residential Land, Hunting Land

Details

  • Great wildlife populations including deer, bear & turkeys
  • 25+- acres of tillable ground producing income
  • 15+- acres of timber managed with habitat in mind
  • Apple trees
  • Red & White Oaks for mast
  • Beautiful transition area between crop field and woods
  • Great buck sign
  • Great history of turkey hunting
  • Secluded food plot locations
  • Small stream
  • Great access to I-79
  • Access from 2 paved roads
  • Local fishing including Edinboro, Lake Erie and Pymatuning to name a few
  • 1 bed 1 bath home needing a little TLC
  • Dwelling would make a perfect camp/cabin
  • New furnace
  • New water well
  • Enclosed porch
  • Sellers oil, gas and mineral rights are negotiable
  • Approx 30 minutes to downtown Erie
  • Approx 1 hour 30 minutes to Pittsburgh
  • Approx 1 hour 45 minutes to Cleveland, OH

Other

Utilities

electric
Onsite
propane
Onsite
natural gas
Onsite
water
Onsite
internet
Onsite
telephone
Onsite

Coordinates

41.8799, -80.188

Annual Taxes

$3,076

Sold Property

For more information or to see additional properties currently for sale see Josh Ongley's listings.

Stay Connected

Be Part of a Thriving Land Community!

Get the same expert advice, property strategies, and land management tips that thousands of landowners trust. Subscribe now and stay ahead in the market.